Forrester heights Requested final walk thru and re-inspectIPM.Note
Forrester heights Requested final walk thru and re-inspect
Steve Harrington
Jon Yanasak
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY
Forrester heights Requested final walk thru and re-inspect
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jon Yanasak
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY
Steve Harrington; Jim Gibson; Tim Peterson
Forrester heights Requested final walk thru and re-inspect
Steve/Jim/Tim,
Attached is the response to this requested walk thru. A total waste of time.
I have instructed Randy to (in the future) just walk away from requested inspections when he finds that the work is not completed. Doing partial finals for contractors is too time consuming
for us.
Jon Y
<DC90029353CCCD468AA2A2858FFCD8F5397D7A@server1.ci.yelm.wa.us>
Forrester heights Requested final walk thru and re-inspect.EML
Jon Yanasak
Jon Yanasak
11.0
Forrester Heights requested walk thru - punch list Aug. 15, 2007
Forrester Heights requested walk thru - punch list Aug. 15, 2007
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
458-8423
Community Development
Steve Harrington
Steve Harrington
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
458-8499
Public Works
Tim Peterson
Tim Peterson
Forrester Heights requested walk thru - punch list Aug. 15, 2007.doc
CITY OF YELM SEWER DEPARTMENT
Aug 15, 2007
Re: Requested re-inspect and final walk thru –Forrester heights
Randy wasted a couple of hours yesterday doing this re-inspection. Non of the items on the original punch list have been addressed.
Additionally, now that the rest of the Carson boxes have been installed, these items need to be added to the punch list:
A broken Carson Box needs to be replaced at lot 7
A broken Carson Box needs to be replaced at lot 13
The valve needs to be exposed in the Carson box for lot 17
At lot 21, the irrigation control box and the sewer Carson box are only 2’ apart. 10’ of separation is required.
A broken Carson Box lid must be replaced at lot 22.
At lot 23, the irrigation control valve is 4’ from the sewer Carson box. 10’ of separation is required.
.doc
FORRES~1.DOC
Forrester Heights requested walk thru - punch list Aug. 15, 2007.doc