Loading...
Response to 8-17-07 Letter 001_..- F ~~;~ ___ __ _ _ _ _. _. _._____ -~,1r.~ --- ---- August 29, 2007 Steve Harrington azoo s.m nve se, score acI City of Yelm ~ - La~ev, wn eesos Community Development Department (3607 aes-sooz 105 Yelm Avenue West c35o7 a93-za]e Fa. Yalm, WA 98597 ~a c-.:~a ~o ~:mnogg roan. nom www.tnes~zo~o~~P.com RE: Forrester Heights jPalisades West)Subdivision SUB 05~0458~YL Dear Steve. The following items have been acknowledged and addressed aaordingly per your inspection letter of August 17, 2007. Please proceed with approval of the foal plat. Water 1. Hydrant locks have been purchased. 2. The booster pump station design has been submitted to the City for approval. We have already requested foal plat approval prior to having it operatlonal and have received City permission to proceed. 3. Damaged meter box has been replaced. 4. The irrigation control box on Lot 21 has been relocated to maintain 10 separation from sewer box. 5. Sewer box lid has been replaced on Lot 22. 6. Same as #4 on Lot 23. . 7. Same as #5 on Lot 7. 8. Same as #5 on Lot 13. 9. Sewer valve has been exposed on Lot 17. 10. Same as #4 on Lot 21. 11. Same as #5 on Lof 22. 12. Same as #4 on Lot 23. Civil 1, ADA ramp has been repaired. 2. Grade at back of walk on Lot 24 has been adjusted. Landscape 1. Storm pond and planter strips have been hydroseeded. 2. Debris has been removed. 3. Acknowledged. 4. Acknowledged. Please call if you have any ques'' ank you Very truly yours, /^ //' SLCInt K ITEXT1MrojeM Files..12005 PF10501]ICOrteslHamngtonOB290].tlac DESIGN/BUILD CIVIL AND TRANSPORTATION ENGINEEF[NG PLANNING SURVEYING