Loading...
City of Yelm Inspection Form 13 Sidewalk Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/22/07 Day: Monday Time: 8:30 a.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on placing sidewalk forms on Cullens Rd. and inside of plat. Sidewalk forms on Cullens need to have the jog taken out. Guide wire for power pole will have to move.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on sidewalk.  Sketch or Paste Pictures Below:    Date 10/22/07 Typed or Printed Name and Title Steve Harrington Signature