CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/22/07
Day: Monday
Time: 8:30 a.m.
Project Name:
Trump Plat
Project Number
SUB-05-0456-YL
Project Description:
Subdivision
Contractor's Name:
Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on placing sidewalk forms on Cullens Rd. and inside of plat. Sidewalk forms on Cullens need to have the jog taken out. Guide wire for power pole will have to move.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on sidewalk.