City of Yelm Inspection Form 14 Sidewalk Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 11/20/07 Day: Tuesday Time: 9:30 a.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on placing sidewalk forms on and ramps on Van Trump, inside of plat. Sidewalk being poured on Van Trump up to ramps forms. Curb was staked wrong and I could not pass the inspection on the ramp forms. Contractor had to remove section of curb and restake due to bad survey staking. Scott Ritter was on site and is aware of this. New forms for curb & gutter and sidewalk in correctly.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on sidewalk.  Sketch or Paste Pictures Below:    Date 11/20/07 Typed or Printed Name and Title Steve Harrington Signature