City of Yelm Inspection Form 15 Sidewalk Trump Plat
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 12/21/07
Day: Friday
Time: 3:30 p.m.
Project Name:
Trump Plat
Project Number
SUB-05-0456-YL
Project Description:
Subdivision
Contractor's Name:
Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor Sub working
on retaining wall and small utilities.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on retaining wall and small utilities.
Sketch or Paste Pictures Below:
Date
12/21/07
Typed or Printed Name and Title
Steve Harrington
Signature