City of Yelm Inspection Form 15 Sidewalk Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 12/21/07 Day: Friday Time: 3:30 p.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor Sub working on retaining wall and small utilities.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on retaining wall and small utilities.  Sketch or Paste Pictures Below:    Date 12/21/07 Typed or Printed Name and Title Steve Harrington Signature