City of Yelm Inspection Form 16 Paving Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 11/30/07 Day: Friday Time: 9:15 a.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating / Lakeside Industries / Construction Testing Laboritories, Inc.  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Lakeside Industries is paving on the inside plat streets and the frontages for Cullens road and Longmire roads. Lakeside will be finished today. Lakeside tester is onsite testing, he gave me the numbers for compaction and moisture on the crushed top course rock. The numbers are good. He is also testing the density test for compaction on the asphalt. Construction Laboritories is also on site testing for Scott Ritter (Owner). The tester has given me a copy of her field inspection report, I will place in the file folder.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Paving in progress.  Sketch or Paste Pictures Below:    Date 11/30/07 Typed or Printed Name and Title Steve Harrington Signature