Loading...
City of Yelm Inspection Form 17 Punchlist Items Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 2/26/08 Day: Tuesday Time: 9:00 a.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating / Lakeside Industries / Construction Testing Laboritories, Inc.  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Meet with Scott Ritter (Owner) to go over punchlist items and gather information and pictures to take to the SPR Meeting today, to get group approval for Trump Plat storm pond fence gate location for accessing pond if needed.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Paving in progress.  Sketch or Paste Pictures Below:    Date 2/26/08 Typed or Printed Name and Title Steve Harrington Signature