City of Yelm Inspection Form 17 Punchlist Items Trump Plat
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 2/26/08
Day: Tuesday
Time: 9:00 a.m.
Project Name:
Trump Plat
Project Number
SUB-05-0456-YL
Project Description:
Subdivision
Contractor's Name:
Capital Septic and Excavating / Lakeside Industries / Construction Testing Laboritories, Inc.
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Meet with Scott
Ritter (Owner) to go over punchlist items and gather information and pictures to take to the SPR Meeting today, to get group approval for Trump Plat storm pond fence gate location for
accessing pond if needed.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Paving in progress.
Sketch or Paste Pictures Below:
Date
2/26/08
Typed or Printed Name and Title
Steve Harrington
Signature