CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 6/14/07
Day: Thursday
Time: 10:00 a.m.
Project Name:
Trump Plat
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on 12”ADS storm conveyance system. CSE called requesting a change to storm c.b. # 7 due to utilility conflict, they want to move it 5’ to 6’ to the east to avoid conflict with existing
utility. This change has gone through the engineer who made a drawing of change and has submitted to the city for approval. This change is o.k. with the city.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on installing storm drainage.
Sketch or Paste Pictures Below:
Date
6/14/07
Typed or Printed Name and Title
Steve Harrington