City of Yelm Inspection Form 3 Storm Sewer Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 6/25/07 Day: Monday Time: 9:10 a.m.  Project Name: Trump Plat Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on Step Sewer System. Contractor is not on site at this time. I stopped by to check progress and inspect.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on installing storm drainage.  Sketch or Paste Pictures Below:    Date 6/25/07 Typed or Printed Name and Title Steve Harrington Signature