Loading...
City of Yelm Inspection Form 6 Storm Sewer Trump Plat City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 7/16/07 Day: Monday Time: 10:10 a.m.  Project Name: Trump Plat Project Number SUB-05-0456-YL  Project Description: Subdivision Contractor's Name: Capital Septic and Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on Storm System. Jon Edwards and I are out on the project site talking to contractor about schedule and placing the storm water infiltration system. Contractor is working on excavating the infiltration pond, prepping for placing washed rock and fabric to set perforated pipe in.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on installing storm drainage.  Sketch or Paste Pictures Below:    Date 7/16/07 Typed or Printed Name and Title Steve Harrington Signature