City of Yelm Inspection Form 8 Storm Sewer Trump Plat
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 7/18/07
Day: Wednesday
Time: 9:30 a.m.
Project Name:
Trump Plat
Project Number
SUB-05-0456-YL
Project Description:
Subdivision
Contractor's Name:
Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on Storm System. Jon Edwards and I are out on the project site talking to contractor about schedule and placing the storm water infiltration system. Contractor is working on excavating
the infiltration pond, prepping for placing washed rock and fabric to set perforated pipe in. Placing washed rock fabric to wrap pipe and rock and placement of washed rock 1’ above.
Backfilling infiltration gallery with native material.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on installing storm drainage.
Sketch or Paste Pictures Below:
Date
7/18/07
Typed or Printed Name and Title
Steve Harrington
Signature