Loading...
8338 Civil Eng Review No. 2 111203December 16, 2003 Bill Turner Contours and Concepts PO Box 476 Tenino, Washington 98589 RE: Lee Orchard Motorcycle Shop Civil Engineering Review No. 3 City of Yelm Project SPR-03-8338-YL Dear Mr. Turner: I have reviewed the civil engineering plans. The following are comments from the above referenced plans and need to be addressed before the final submittal. I have organized these comments by type. Landscape Plans: (Comments from Tami Merriman) A landscape plan needs to be submitted and approved before the civil plans will be approved. When submitting the final civil engineering plans for signature, you will be required to submit the following information: 1 set of full size civil engineering documents (mylar, city copy) 1 set of full size civil engineering documents (paper, your copy) 1 set of 11x17 civil engineering documents (paper) 1 cd with the project AutoCAD drawings After the signed paper copy has been returned to you, 4 additional sets of signed plans will be required for the inspectors. After submitting them a preconstruction meeting will need to be scheduled. Please do not submit the final documents until all the above comments have been addressed. If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you. Respectfully City of Yelm Community Development Jim Gibson Development Review Engineer Cc: Lee Orchard Grant Beck Tami Merriman