Loading...
8342 MDNS SEPA NO: 8342 MITIGATED DETERMINATION OF NONSIGNIFICANCE Proponent: Mike McKinnon, Forbest Partners Description of Proposal: Construction of an 8,324 sq. ft. commercial building to include fast food restaurant, bank, and miscellaneous retail. Location of the Proposal: SE Corner of Yelm Avenue East and Plaza Drive. Section/Township/Range: Tax Parcel number 22730110103, Sec. 30, T17N, R 2E. Threshold Determination: The City of Yelm as lead agency for this action has determined that this proposal does not have a probable significant adverse impact on the environment. Therefore, an environmental impact statement (EIS) will not be required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Conditions/Mitigating Measures: SEE ATTACHED Lead agency: City of Yelm Responsible Official: Grant Beck, Community Development Director Date of Issue: July 28, 2003 Comment Deadline: 5:00 P.M. August 11, 2003 Grant Beck, Community Development Director This Mitigated Determination of NonSignificance is issued pursuant to Washington Administrative Code 197-11-340(2). The City of Yelm will not act on this proposal prior to 5:00 p.m. Comments must be submitted to Tami Merriman, Community Development Department at, City of Yelm, 105 Yelm Ave. W., P.O. Box 479, Yelm, WA 98597, by 5:00 p.m. August 11, 2003. You may appeal this determination to the Yelm City Council, at above address, by submitting a written appeal no later than 5:00 p.m. August 18, 2003. You should be prepared to make specific factual objections. Contact Grant Beck, Community Development Director, to learn more about the procedures for SEPA appeals. This MDNS is not a permit and does not by itself constitute project approval. The applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (14.08), Storm water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program. ----------------------------------------- DO NOT PUBLISH BELOW THIS LINE Published: Nisqually Valley News, Friday, August 1, 2003 Posted in public areas: Tuesday, July 29, 2003 Copies to: - Dept. of Ecology w/checklist Tuesday, July 29, 2003 All agencies/citizens on SEPA mailing list and adjacent property owners. ATTACHMENT SEPA CASE NO.: 8342 This Mitigated Determination of Non Significance is based on the project as proposed and impacts and mitigation reflected in the following: Environmental Checklist (dated May 20, 2003, prepared by Hatton Godat Pantier) Traffic Impact Analysis (Dated April 2003, prepared by the Shea Group) Memorandum Amending the Traffic Impact Analysis (dated July 11, 2003, prepared by The Shea Group) Preliminary Storm Drainage Report (dated May 1, 2003, prepared by Hatton Godat Pantier) And the following conditions: The proponent shall mitigate transportation impacts based on the new p.m. peak hour trips generated by the project. The transportation facility charge (TFC) shall be based on uses proposed at tenant improvement. Plaza Drive shall be improved as required in the City of Yelm Development Guidelines. The intersection on Plaza Drive, at Yelm Highway shall include a 12’ outbound lane, a 12’ dedicated left turn lane, and a 16’ inbound lane.