Loading...
20040184 Permit Pkg,. -- za%~, ~ ~ ~ ~ ~ ~ ~~ l C ~ ~ O~f 1 Ida, O~ l! r~ I,~ ._,~~ >:t1~~!. __ ~ 1 ~-.~! i~._. ~_ _.1tT ~._ '_`~L'J:~~_~~'::,YS. _-~.il:.~Y,~~~11~s: ~v ~_vi Vni'~ J~II-I i i' I II ! I I - I.I~ 'I I!~_ ~~~-.r!~ 1'~~-~'~tit~c~.S PRE-CONSTRUCTION CONFERNECE Project title: Interior Alterations and Improvements for Timberland Bank Yelm, Washington Date of conference: July 1, 2005 Weather: Overcast, mid 60° Attending: Tom Rieger, Street Lundgren & Foster Architects T: 360-249-401 1 Floyd Plemmons, Rognlin's Inc. T: 360-532-5220 Tom Dineen, Rognlin's Inc. T: 360-580-9289 Tom Gamino, Campbell Electric T: 36U-533-3036 C: 360-970-3160 Corey King, King Enterprises T: 800-338-5464 Doug Barton, Olympic Telephone T: 360-357-41 79 Jeri Goetschel, Timberland Bank T: 360-458-2221 Richard Zeh, Timberland Bank T: 360-533-4865 DISCUSSION Tom Rieger asked Floyd for list of subcontractors and estimated starting date. Floyd proposes beginning work July 20, 2005. Tom to prepare letter to proceed for said day and deliver to Rognlin's. Tom noted that coordination between all trades involved will be key to project success. Corey King and Doug Barton to coordinate moving existing wiring for temporary use until new walls are installed. Corey to relocate existing security video to area designated as temporary manager location as noted on phasing plan. Corey needs 1 '/a" conduit, 16"-18" from corner, stubbed up in new wall between break room and customer service. Corey noted to Jeri that security system will be switched to wireless system. Floyd noted electrical panel for yard sprinklers will need to be relocated in new existing wall. Suggest mounting face flush with finish face of break room wall. Pre-Construction Conference July 1, 2005 Page 2 Richard and Doug discussed running temporary data lines over existing flooring until new teller line is ready. Floyd noted it may be possible to change out the existing teller line with the new teller line in one long weekend. Long weekend will require closing bank on Saturday or using a three day holiday weekend. Richard feels it would be easiest to coordinate his efforts on anon-holiday weekend. If anon-holiday weekend is to be used for teller line change-out, the bank requires three weeks minimum notice so they can let their customers know of the Saturday closure (possible to keep drive-up open). Jeri asked about getting magnetic locks for the doors. Richard noted that it will be easier to add magnetic locks now while everything is open. Tom Rieger will ask Mike Sand about including magnetic locks in this project. Jeri asked about secure storage separate from general storage for hard copies of customer account information. Jeri mentioned possibility of locking file cabinets. Richard also inquired about a separate secure room for the data equipment, or the possibility of a locking cabinet. Tom to look into possibilities and discuss options with Mike Sand. Tom Gamino discussed probability of seeing electrical cord running along top of trusses for new suspended lighting. Tom Rieger not opposed to cord location, but it needs to be installed clean and neat, option to use wire mold that can be painted to match ceiling and trusses. Tom Dineen, Floyd, and Tom Rieger discussed new entry walk and elevation differences. Tom Rieger to work out and get drawing to Rognlin's. Respectfully submitted, i ~`om Rieger STREET LUNDGREN & FOSTER ARCHITECTS c: Mike Sand Floyd Plemmons Gary Carlson, Building Official