20080016 Permit Pkg 022508CITY OF YELM -BUILDING DEPARTMENT
CERTIFICATE OF OCri pew
Building Address 14850 91 ~ Ave. SE Fire Zone
Occupancy Group A-3
Owner Name Merle Hom Use Zone R-4
Owner Address 14856 915 Ave. SE Type of Construction V-B
Yelm, WA 98597
Building Permit Number BLD-OS-0016-Y_L Plan Number
Has been inspected and the following occupancy thereof is hereby authorized
Floors
Occupancies Area under
This Certificate
S uare Feet Maximum
Occupant
Load Maximum Allowable
Floor Loads
Lbs. er S . Ft.
1 A-3 3051 113
Areas
Special Conditions: Maintain all exits, post occupant load
Is Building Sprinklered? YES X NO
Building Official: G. Carlson Date: April 13, 2009
POSTING: The Certificate of Occupancy shall be posted in a conspicuous place
on the premises and shall not be removed except by the Building Official.
n, n, n, n, n, n, n, n, n, n, n, n, n, n, n, n, n, n, n, n~ n~ n ~n ~ n
~a~ THEp'~ Clty Of Yelm Permit No: BLD-08-0016-YL
Q
4 ~ Community Development Department Issu e Date: 02/25/2008
Building Division (Work must be started within 180 days)
Phone: (360) a58-8407 Receipt No: 53163
Y LM Fax: (360) 458-3144
Applicant:
Name: Hom, Merle
Phone: 360-4007437
Address: 14948 89th Ave SE City: Yelm State: WA Zip 98597
Property Information:
Site Address: 91st Ave SE
Assessor Parcel No. Subdivis ion: Lot:
Contractor Information:
Name: Pichler Construction
Contact:
Phone: 360-458-9963
Address: P.O. Box 2028 City: Yelm State: WA Zip: 98597
Contractor License No: PICHLC977CQ Expires: 02!18/0949 Business License:
Project Information:
Project: Bella Housa Rec Center
Description of Work: 3051 sf Rec Center
Sq. Ft. per floor: (1st) 3051 (2nd) 0 (3rd) 0 Garage 0 Basement 0
Heat Type (Electric, Gas, Other): GAS
Fees:
Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
Building Permit 100-500k 2,178.15 993.75 1,184.40 5.6000 211.5000 $1,000
Building Plan Review 1,415.79 0.00 0.00 0.0000 0.0000
Mechanical Permit 88.00 0.00 0.00 0.0000 0.0000
Plumbing Permit 97.00 20.00 77.00 7.0000 11.0000 Fixture
Sewer ERU 17,655.00 0.00 17,655.00 5,885.0000 3.0000 ERU
Sewer Inspection 435.00 0.00 435.00 145.0000 3.0000 ERU
Water ERU 4,500.00 0.00 4,500.00 1,500.0000 3.0000 ERU
Water Deposit Commercial 120.00 0.00 120.00 40.0000 3.0000 ERU
Traffic Facilities Charge 0.00 0.00 0.00 1,276.0000 0.0000 Peak PM Trip
Sewer Deposit Commercial 150.00 0.00 150.00 50.0040 3.0000 ERU
Fire District Impact Fee 976.32 0.00 976.32 0.3200 3,051.0000 square foot
State Building Fee 4.50 4.50 0.00 0.0000 0.0000
Water Meter (Commercial) 300.00 300.00 0.00 0.0000 0.0000
TOTAL FEES: $27,919.76
Applicant's Affadavit:
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of
Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants,
easements and restrictions of record. If applying as a contractor, I futher certify that I am currently
registered in the State of Washington.
f i
Signature ~ ~~1~ /-~~~.~ 'I~`~ ~~ ~ ~ 1 ~ Date ~-~ /L 1 /~~
Firm
LL
OFFICIAL USE ONLY
# Sets of Prints:
Finallnspecti n:
-'`; ,~ ..
Date ~ ,
a -al_~~
~~OF T"~A~ City of Yelm Permit Fees Schedule
a
n Community Develop ment Department ~'~' "~
~ ~
~ Permit No:
BLD
.
Building Division . -08-0016-YL
Phone: (360) 458-8407 •- ~S ~r ~ ~ ~ S FEg 2 2 2008 ~~31~
YELM Fax: (360) 458-3144 ~ ~,j~' ~~
~
~~~
, '--
Applicant: ,
Name: Hom, Merle Phone: 360-4007437
Address: 14948 89th Ave SE City: Yelm State: WA Zip 98597
Project Information: ~,1~w~,-r~~,r*Y~.~~~,~„
Project: Bella Housa Rec Center
Description of Work: 3051 sf Rec Center
Site Address: 91st Ave SE Assessor Parcel No.
Fees:
Item
Acct Code
Item Fee
Base Amt
Unit Fee
Unit Rate
No. Units
Unit Desc
Building Permit 100-500k
032 001-322-10-00
2,178.15 ---------
993.75 ---------
1,184.40 ---------
5.6000 ----------
211.5000
$1,000
Building Plan Review 100 001-345-83-00 1,415.79 0.00 0.00 0.0000 O.OD00
Mechanical Permit 032 001-322-10-00 88.00 0.00 0.00 0.0000 0.0000
Plumbing Permit 032 001-322-10-00 97.00 20.00 77.00 7.0000 11.0000 Fixture
Sewer ERU 802 412-343-50-01 17,655.00 0.00 17,655.00 5,885.0000 3.0000 ERU '~.~'6*-r•.
Sewer Inspection 805 412-343-80-00 435 0.00 435.00 145.0000 3.0000 ERU /'
Water ERU 715 401-343-80-02 4,500.00 0.00 4,500.00 1,500.0000 3.0000 ERU
Water Deposit
Commercial 740 402-389-00-00 120.00 0.00 120.00 40.0000 3.0000 ERU
Traffic Facilities Charge 420 120-345-85-00 0.00 0.00 0.00 1,276.0000 0.0000 Peak PM Trip
Sewer Deposit 742 402-389-01-00 150.00 0.00 150.00 50.0000 3.0000 ERU
Commercial 105 001-345-85-00 976.32 0.00 976.32 0.3200 3 ,051.0000 square foot
Fire District Impact Fee 160 001-386-00-00 4.50 4.50 0.00 0.0000 0.0000
State Building Fee 712 401-843-80-01 300.00 300.00 0.00 0.0000 0.0000
Water Meter
(Commercial)
TOTAL FEES: $27,919.76
~~~
~ ~~ ~ c~u
~~~-~~
CITY OF YELM
COMMERCIAL BUILDING PERMIT APPLICATION FORM
Project Address: / ' l ~' Y G ~~/ }f /~ ~rparcel #: L~ ~ ~ ~J` \ ~ C~} (~
Zoning;,- Current Use: Proposed Use~c.i.~- =.~..- ~~~ ~~
'~ New Construction r Re-Model / Re-Roof /Tenant Improvement
Plumbing i Mechanical ~~ Fire _Pr\enUSuppress/Alarm i ~ Other
Project DescriptioNScope of Worfc-- ~ ~ , ; ~,.,~ ~~ ~ _ L,L,,,`
Building Area (sq. ft) Parking Garage -~ 1 ~` Floor ivy ~ 2"d Floor -- and Floor -
Building Height t`~` ~ 3~~~
Copy of City Mitigation documentation (TFC).
I hereb ertify that the above Information is correct and that the construction on, and the occupancy and the use of the
abovq~des abed props in accordance with the laws, rules and regulations of the State of Washington and the
City ~if Yel
~ - - ~} 1
Applican~'s_SlOnature ate
Owner d Contracto~J Owner's Agent /Contractor's Agent /Tenant (Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun
within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days
105 Yelm Avenue West (360) 468-3835
AO Box 479 (360) 458-3144 FAX
Yelm, WA 98697 www.ci.yelm.waus
3 ~-~-~ c~-'~
Are there any environmentally sensitive areas located on the parcel? _~ If yes, a
completed environmental checklist must accompany permit application.
BELLA HOUSA VILLAGE, LLC 373
-~ ~ ~ ~
` ` v
1
~~ '~1 L
_~ ~ j ~~
BELLA HOUSA VILLAGE, LLC 373
CITY OF ~--- --
YELM
P.O. Box 479
Yeim, WA 98597 RECEIPT No. 5 316 3
360-458-3244
RE~;~I*V,€,Dy~ENTY SEVEN THOUSAND NINE HUNDRED NINETEEN DOLLARS & 76 CENTS
RECEIVED FROM DATE REC. NO. AMOUNT REF. NO.
BELLA HOUSA VILLAGE, LLC 02/25/08 53163 27,919.76 CHECK 373
14948 89TH AVE SE
YELt•I, PIA 98597 BUDGETARY
300-400-7437
LORI
FLU-quo-v~t7lo-rL
3051 SF REC CENTER - 91ST AVE SE
Sc7, a:~ ~ z r,~c ~ 1
V l C~ `~ • C1~~%
~~~t~~
'f%oF ~'+EP,~ ~' City of Yelm
9
C ~~~ Permit No: BLD-08-0016-YL
~
~
ommunity Development Departme nt
Issue Date: Not Issued
~' m 5
Buildin Division 2 200
EB 2 (Work must be started within 180 days)
~
' Phone: (360) 458-8407 qJ~~ ~ Ceipt No:
yEL1VI Fax: (360) 458-3144 ~
C~~' ~ ,
` t
Applicant:
Name: Hom, Merle Phone: 360-4007437
Address: 14948 89th Ave SE City: Yelm State: WA Zip 98597
Property Information:
Site Address: 91st Ave SE
Assessor Parcel No. Subdivisi on: Lot:
Contractor Information:
Name: Pichler Construction Contact: Phone: 360-458-9963
Address: P.O. Box 2028 City: Yel m State: WA Zip: 98597
Contractor License No: PICHLC977CQ Expires: 02/18/0949 Business License:
Project Information:
Project: Bella Housa Rec Center
Description of Work: 3051 sf Rec Center
Sq. Ft. per floor: (1st) 3051 (2nd) 0 (3rd) 0 Garage 0 Basement 0
Heat Type (Electric, Gas, Other): GAS
Fees:
Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
Building Permit 100-500k 2,178 15 993.75 1,184.40 5.6000 211.5000 $1,000^
Building Plan Review 1,415.79 0,00 0.00 0.0000 0.0000
Mechanical Permit 88.00 0.00 0.00 0.0000 0.0000
Plumbing Permit 97.00 20.00 77.00 7.0000 11.0000 Fixture
Sewer ERU 17,655.00 0.00 17,655.00 5,885.0000 3.0000 ERU
Sewer Inspection 435.00 0.00 435.00 145.0000 3.0000 ERU
Water ERU 4.500.00 0.00 4,500.00 1,500.0000 3.0000 ERU
Water Deposit Commercial 120.00 0.00 120.00 40.0000 3.0000 ERU
Traffic Facilities Charge 0.00 0.00 0.00 1,276.0000 0.0000 Peak PM Trip
Sewer Deposit Commercial 150.00 0.00 150.00 50.0000 3.0000 ERU
Fire District Impact Fee 976.32 0.00 976.32 0.3200 3,051.0000 square foot
State Building Fee 4.50 4.50 0.00 0.0000 0.0000
Water Meter (Commercial) 300.00 300.00 0.00 0.0000 0.0000
TOTAL FEES: $27,919.76
Applicant's Affadavit:
I certify that I have read and examined the information contained within the application and know the same
OFFICIAL USE ONLY
to be true and correct. I also certify that the proposed structure is in conformity with atl applicable City of
Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, # Sets of Prints:
easements and restrictions of record. If applying as a contractor, I futher certify that I am currently
registered in the State of Washington. Final Inspection:
Signature Date Date:
Firm By:
10/05/2007 11:38 FAX
-~- wrightsoft
tlr NCR dnla~
Building Analysis
Entire house
Black Hills Inc.
~ 003
Job:
Dace: o~c u, soon
By: Dean Fauat
• - • ~
For. Bellahousa Village Rec Center
~esian Conditin
Location:
Olympia, WA, US Indoor:
Indoor temperature (°F) Heating
70 Coaling
75
Elevation: 200 ft
Latitude: 47°N Desi n TD (°F
~ 47 14
Rela
ve humidity (%) 30 50
Outdoor: Heating
Dr
lb
b
°F
23 Cooling
8 Moisture difference (gr/Ib) 18.9 -11.5
y
u
(
)°
Dally range (F) - 9
25 (M) Infiltration:
Wet bulb
-
( F~
65 Method
Construction quality Simplified
Tight
p~
Winds m h 15.0
p) 7.5 Fireplaces 0
~ Heating
Com onent Btuh/ft' Btuh % of load
Walls 3.2 8188 8.3
Glazing
Doors
Ceilings
Floors 27.8
18.3
1.5
2.4 8824
7763
4530
7106 9.0
7.9
4.6
7.2 °~`°
„„",,,
~ _
Infiltration
Ducts 0.7 2432
21777 2.5
22.1 ~~ -
Piping
Humidification 0
0 0.0
0.0 .,,...-'
w~„~„
Ventilation 37793 38.4
~
Adjustments 0 ""~
Total 98413 100.0
•• ~
Com Went Btuh/ft2 Btuh % of load
Walls 0.9 2404 3.3
Glazing 46.8 14845 20.4
Doors 8.9 3782 5.2
Ceilings 1.5 4472 6.2
Fbors 0.3 968 1.3
Infiltration 0.1 362 0.5
Ducts 21006 28.9
Ventilation 11257 15.5
Internal gains 13540 18.6
Blower 0 0.0
Ad1ustments 0
Total 72837 100.0
Overall U-value = 0.083 Btuh/ft? °F
Data entries checked.
BokNhYc values have been manually weiAdien
Wf fG7f'7t5~fC ~9h1-SultaReaidentlel6.0.100RSR48435
C:UJsars~0'ean Fauet~eaWnp~BF11A OF~4N.rrp Cek=NUB Orlmhatlon ~ N
2007-Od-05 08:25:51
Page 1
LG ~ L l ~ ~~
10/05/2007 11:37 FAX
1002
Sheet 1
^..
__ __---i F---- --
I
~~ i I
Storage Mechanic Bantry
i ;
' I ~~
i
HBUm s"
~1
I
~~
~
LIBRARY I,i_
'
I+ ----
-' -_.._--
~
-.--~___» ~..
;
. i
Wornens Reslroom
I
j
~.
- -- -
,_
_ ..,
GREAT ROOM
~ DONNING
~ !
! t
MASSAGE `I ~
! +, I Mens Restroom r
J _ -
,~ I
,.I
_ ~
Room16
,..
_ ~ ~_._.._
f . __~
_. ~
--~
Ii L
Storage
HE ~ 't
5~.-..I
~~ l r,_, .., ~'1. ~-~ -^ ,,. _ ~:..
; , .. -,... ....... ...~ ~.-r . _ ~-
'~ .fit : ..._~i:
~~ 1
:~
'
OFFICE
GYM i ENTRY
f~
~~ J ~ ~
__ _ _...
U
Job #:
Performed by Dean Faust for:
Bellahousa Village Rec Center
Black Hills inc.
1003 85th Ave. Suite A
Olympia, WA 98501
Phone: 705-8590 Fax: 705584
dean@blaCkhillsinc crm
Scale: 1 : 122
Page 1
Right-Suite Residential
8. p.100 RS R48435
-~
C ~E~E,
1 ~D
•. CCT~z100~
.-
~-~ STRUCTURAL CALCULATION
For
Bergford & Associates
For
P Bella Housa Community Center
Lateral and Vertical
~° Design
Project # 2007249-A
- October 2, 2007
r
r
Precise En~ineerin Inc.
1011 Mellen Street * Centralia, WA 98531
(360) 736-1137 ~ Fax (360) 807-0108
e-mail: preciseengineering~comcast.net
I
r
r
..
..
STKUCTURAL CALCULATIONS
For
Bergford & Associates
For
Bella Housa Community Center
-- Lateral and Vertical Design
October 2, 2007
Project # 200729-A
By
PRECISE ENGINEERING INC.
HAROLD HAHNENKRATT, P.E.
.-
r
r 1 U- ~ ~~ C_~ ~.
Project #2007249-A
10/2/2007
Page 2
SCOPE: Provide structural calculations for lateral design and vertical design per the
2006 IBC.
LOADS AND MATERIA LS
Roof: Mtl Roofing S.Opsf
__ Pre-engineered Trusses @ 24" oc 2.9psf
Roof Sheathing 1.Spsf
Insulation 1.2psf
5/8" GWB 2.8psf
Misc. 1.Spsf
Dead Load = 14.9» 1 Spsf
Snow Load = 25psf
Wall: 2x6 Studs @ 16"oc Dead Load = l Opsf
Floor: Slab on Grade
Live Load = 40psf
Wind: 85 MPH Exp. B
~_~ Seismic: Site Class = D
Design Category = D
Use Group = I
R = 6.5,2.2
Ca = 4
~o = 3
Soil: Allowable Bearing = 1500 psf
(assumed)
Lumber: 2x > 4x = #2DF
6x> _ #1DF
GLB = 24f-v4 for simple span
_ = 24f-v8 for cont. and c antilever.
Concrete: f c = 2500psi
Rebar = Grade 60
r
..
Project #200724Q-A
_ LATERAL DESIGN
Wlnd Loading: Simplified (IBC 1609.6)
Ps = ~ KztlwPs3o
Wind Speed 85 mph
Exposure B
Roof Pitch 6:12
'. ~ = 1
Kn = 1
1= 1
ps30 = 10 (Roo17
12.4 (Wall)
ps = 10.0 (Roofl
12.4 (Wall)
Seismic Design Category -Conterminous 48 States
_ Latitude = 46.95886, Longitude = -122.64027
MCE MAP VALUES
Short Period Map Value - Ss = 117.5% g
1.0 sec Period Map Value - S1 = 37.6% g
RESIDENTIAL DESIGN INFORMATION
Short Period Map Value - Ss = 117.5% g
Soil Factor for Site Class D - Fa = 1.03
Residential Site Value = 2/3 x Fa x Ss = 80.7% g
Residential Seismic Design Category = D1
Seismic Loading:
Simplified (IBC 1617.5)
V = (1.2SDS/ 1.4 R )Wt.
`S DS
R=
R=
V=
V=
0.807
6.5 (Wood Shear Wall)
2.5 (Cantilever Column)
0.106 Wt. (Wood Shear Wall)
0.277 Wt. (Cantilever Column)
~r~~2~7
1P~ 3
1 i 1 1 i 1 1 1 I I 1 1 1 t t I 1 1 1
Q -- -~
- - -
- --5fi'.o•- - --
- --
~3'-8" - ----8'-8•--~ 3'•8•----3~- fi'-p" - 3'-0•-r- 5'd' 3-0"-r:-g'-g•._ .._I _g'-0' i.3-0"8~ i '^~--4
- - I - - - ~ '' '~"-.
7 I I. - II, (wd~
pn
I ~ ebma - ~ ~ ~ ~ ~ ~ - --- ;~
-, --r
urewa I i
`'! I b I ~ ~..., .. PANTRY ~~ - i- ~.
,
i ~ LIBRA~~Y ! ~ m - .~ ~ I ~--_ m ' STORAGEIMECHANIGAL ; ,.~a~~ b ~ ~ =-i O
zm I '+
~,- I II ~ 61 ~ n TMlsgoau i m ~ - -? ~
L
i I W! -1 II ~ P°' I II racaw ne AOOU % N
'1 , j ( - -
lutnwr ~ ' l eomq --~J~ aexoR I~_ Lon I-I I O
- ! ~;A vacmlwcixrewaow -jrei - -- ' __ w. - .. il.._ ` i ~ ~ O
- ~. m -'°-~ v ~
~, I ~~~_
I , .. .;~-..;.,..,. _ - ~ KITCHEN ~ ~~, I ~J ~
NI-- ~, - - I rAi' ~ 0
_ ,~ / a
„~ ~ ~ ~ _ -~ ' ~~ „- ~I j' __
rac~a.p non aoou~ ~~ ~. ~ ~ ~ ~--- ~ 4~~~ ~~-'
~ '9 I -~j ~ WOMEN5 RESTROOM~ -"
Netl e I
f, m I ~ ,t7w9 F r---- ~~-'
r' ~ li
Ci _- _. ~~ I ! ,~ Ila Claw T6 r00Y ~ '.
o roceuwnaevoow ~"°~ ~ GREAT ROOM I q ~ 1~~=~'
U
c ,tiwrt i' MASSAGE _ ---x
~, ,
~ a4 -~i, vaacnvp4Mnemou ~ raaa.+on+aaoau
II -~~" DINING ~
m~- ', ~, MEN'3 RESTRWM ~ ~ vl eqn ~ I>] I
col ~ouew 7xletoae ~j ~ I ~ ~ -Gar '9 i I ~ = i
srouAGe ~ STORAGE ~. u~mai I .. -
n
675gh
-r ~ _
1 _- I-. ~ iUiNYE ~_ `AiKGaA I k
I ,- ~. ,I ArOVE Ix Ae11C _ I r4CElMGiIKgpW ~ ~
in axixu nwn pss ~~ m I ~~ 'a 1 ~ I
J rMlFiexeAeFNN
y,,, ., -- evawwai eu x6n
1 I i ~b011' yp -. ~ti_.. _ Ixe MPi 01
I M EtE ~ PIL ~ ~ Ai11CTfiAe9FS v i - - ~G -'l ppl~ y~ -~^ } _ ..
Y6lEa f011 iVPoMCE ...I -
li ~'~$ 4 ~j- I I ~~ I
4 vac~wrxlsnoow (
b m ~II~ GYM OFFICE I -~ ~ e
TJ ~~eyr .ls "7n ~ pad ENTRY i~~oa: raccuamau~~ ~ ° ~
rar~awmlraaw ~ 5 h
~ I
~~~ ~~ ~~ I ~ ~ n~_~~~I
' -- - vacawnvsroa ~ _~- _ I = _
~.: i I ~
I ;,
~ ~I o ~t j
_ ae xoq _ aeelon eee~ron
_ «us woe ~ _ -~_ . i O
-
I ~ ~ I ~ O
~~-'~ -,3'-fi•- -.~ i IIi~~~I iI~>,rjl I ~ ~ 'I~~' -I. ~~;, I' I ~ o
I °-4'.111f1• ~r-0".i2,-r-r-0•~,~-"!-e'-0• ._{--;=~rs•-z-r,.rs-~'.~.~r.~.,: _ 12,x. _ _~a,-~,.,
- -28'.2,12'- _. --- ----°----- ifi'-p"- -- -!~ ~N / ~~„~, L
Project #2007249-A
One Story Wind to Diaphragm
Wind
Main Floor plate 9.1 Roof 10
Walls 12.4
l 0/2/2007
Page 5
Diaphragm
Roof Ht. Gable Ht. Wind Load Length Total Load
1-2 Roof 6.5 0 121.42 10 1214.2
2-3 Roof 0 8 155.62 58 9025.96
3-4 Roof 8 0 80 14 1120
SUM 11360.16
Roof Ht. Wind Load Length Total Load
A-B Roof 0 6.5 137.02 56 7673.12
B-C Roof 7 0 70 4 280
SUM 7953.12
~,~,' S ~ `~ V j
7~,~.r~ s /~ ~l v A~ ~~ l.~,a L L
,i ` O
~~, .
Precise Engineering, Inc
102 Otto Road
Centralia, WA 9531
DIAPHRAGMS
Page
Of
•d
"o
~.
N
O
0
J
N
A
Label Level Loading
i Width Length Shear V Shear v Dia. Tie Moment T=C Nailing Requirement
1-2
Roof fl
(P
121.4 (ft)
10.0 (ft)
14.0 (Ibs)
607.0 (plf)
43.4 H1(in)
134.2 A35(in)
124.5 (ft-Ibs)
1517.5 (Ibs)
108.4
8d@6 Cap=170
2-3 roof 156.0 58.0 48.0 4524.0 94.3 61,8 57.3 65598.0 1366.6 8d@6 Cap=170
3-4 roof 80.0 14.0 32.0 1120.0 35.0 166.3 154.3 7840.0 245.0 8d@6 Cap=170
A-B roof 137.0 56.0 32.0 3836.0 119.9 48.6 45.0 53704.0 1678.3 8d@6 Cap=170
B-C roof 70.0 4.0 23.5 280.0 11.9 488.5 453.2 560.0 23.8 8d@6 Cap=170
a
0
N
b ~
~ N
QQ ~
~ O
0~ J
LOAD TO LINES
Roof
Line # ~:~ :i
;: >
;~"
:~
;
•'~ Level
'~~
'`
~
''~`
~ Total ~
`~ _ A`'~ >,~
:;~ ,.;
<
Sub Total Total
v 0 ~
1 607 '-'
G
~ ;~ ~--
~
~
607 a
;: ~
;-~ ~
~~ 0
0
s : -- ,--
~
0 0 607
2 607 ~ 4524 ~ - °
t :
: <
<
5131 ~ ~`
f <~ 0 0
~ ;
: ;
~
~ ~ 0 ~
A -; ~-•~ ~ 0 5131
3
4524
_1120
~
~~-~
5644
;
>~
` ~
z
-~
~-` 0 p
`
'. s ~~
0 ~ ~-~ ' D 5644
>
,--~
~ ._y
~
Sum
11382 E ~ s
~
--
~-~
~
~ ~ Sum
: 0
11382
0 v ;
A
3836 >
~
~ ~ -~
'
• : ;
: ~
_; " s
- 0 0
'. ~-~ # ;; ~ 3836 ~ ~ fi
~~
a
~ -~
0
z
--< 0
3836
B 3836 " 280 ''
- 4116 ~ ~ ~' -
< ~
_~~ <;
~ ~
0 ~~.; 0 4116
'
: -^y -~~
~
~
Sum
7952 ~
~
v ~ ~
'< p 0
>.
,~
;. Sum 0 7952
0
r ~ 0 0
b
M
o,
~.
N
0
0
J
N
Y
0
b N
Pw„ N
nt O
O
J J
Anchor Bolt Capacity
112' Dia. 2xSill = 912
518" Dia. 2x Sill = 1326 x
1l2" Dia. 3x Sill =1120
5l8" Dia. 3x Sill 1664
Plate Height
1siFloorWallHei ht= 9.1111
2nd Floor Wall Hei hl =
3rd Floor Wall Hei hl =
Haldown
Calloul Slze Ca acit
A PHD2 3610
PHDS 4685
PHD6 5860
HDDB A'i~5
b
JOB: ~
Date: gr ~•
Sheet: page 01
N
O
Shea r Wall
Calloul Size Ca aci N
1 10 6 310 If 'p
2 tOd@4 460 plf ~
10d@3 600 plf
O
N
~ ~
~ N
~ O
~ O
~ J
'- Project #2007249-A
10/2/2007
Page 9
TYPICAL SHEAR WALL NOTES
Use 5/8" dia. by 10" Anchor Bolts (AB's) with single plates and 5/8" dia. by 12" AB's with double
and 3x plates spaced as shown on the drawings. AB's shall have 7" of embedment into footing, shall
be centered in the stud wall, and shall project through the bottom plate of the wall and have a
__ 3x3x1/4 plate washer.
All wall sheathing shall be 1/2" CDX plywood, 5/8" T1-11 siding, or 7/16" OSB with exterior
~-- exposure glue and span rated "SR 24/0" or better. All free sheathing edges shall be blocked with 2x4
or 2x6 flat blocking except where noted on the drawings or below.
-- All nails shall be 8d or l Od common (8d common nails must be 0.131 inch diameter, Senco KC27
Nails are equivalent. If l Od common nails are called for the diameter must be 0.148 inches, Senco
MD23 Nails are equivalent). Nail size and spacing at all sheathing edges shall be as required below
or as in the drawings. Nail spacings shall be 12" o.c. for all field nailing except as noted.
M Hold downs are Simpson "Strong Tie" and shall be installed per the manufacture's recommendation.
Equivalent hold downs by United Steel Products Company "Kant-Sag" that have ICBO approval can
be substituted in place of Simpson hold downs. All floor systems must be blocked solid below
member that the hold down is attached to. This block should be equal to or larger than the member
the hold down is attached to and be placed as a "squash block".
All double and triple studs shall glued and nailed together with l Od's at 3" o.c. for each layer.
All 4x studs are to be #2 DF and a116x studs are to be #1 DF when used for hold downs and shear
walls.
ALL WALL AND ROOF FRAMING LUMBER SHALL BE DOUG-FIR #2 OR BETTER.
NOTE: MST STRAPS attaches to (2) 2x or 4x studs in wall above and below unless noted
otherwise. Nail all holes with 16d sinkers.
SHEAR WALL SCHEDULE
sheathing nailed with l Od's at 6" on center all edges.
~ ` `sheathing nailed with 1 Od's at 4" on center al] edges and 4x or 6x studs at anel ed es.
P g
.. HOLD DOWN SCHED ULE
.~ It is the responsibility of the contractor to locate hold down anchor bolt to accommodate all
structural framing. Anchor bolt to be located nearest the corner or opening at the end of the
shear wall. All foundation vents to be a minimum of 12"off centerline of the anchor bolt on
either side. Holdown stud to be coordinated with shear wall panel edge framing
requirements. Larger stud size controls
_ O PHD2 attaches to concrete foundation with a 5/8" dia bolt with 15" minimum
embedment into concrete. PHD2 attaches to double 2x studs or 4x or 6x stud
with (10) Simpson SDS 1/4 X 3 Wood Screws in wall above.
r Project #2007249-A
r
r.
..
r
r
~.
r
r
z
r
~.
..
..
Vertical Design
10/2/2007
Page 10
Project #2007249-A lU/2/2007
Page 11
..
STRUCTURAL NOTES
~'' General Notes:
These structural notes supplement the drawings. Any discrepancy found among the drawings, these notes,
.,_. and the site conditions shall be reported to the Engineer, who shall correct such discrepancy in writing. Any
work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk.
The Contractor shall verify and coordinate the dimensions among all drawings prior to proceeding
with any work or fabrication. The Contractor shall coordinate between the architectural drawings and
the structural drawings. The architectural dimensions are taken to be correct when in conflict with the
structural drawings. The Contractor is responsible for atl bracing and shoring during construction.
All construction shall conform to the applicable portions of the latest edition of the International Building Code
except where noted
"- Design Criteria:
1. Live Load = 40 PSF (Floors)
= 40 PSF (Decks)
= 25 PSF (Snow)
2. Dead Load = 15 PSF (Roof)
= Slab on Grade (Floor)
= 10 PSF (Walls)
= 150 PCF (Concrete)
3. Partition = 20 PSF (Floors)
,~ 4. Wind = 2006 IBC Exposure B @ 85 mph
5. Earthquake = 200616C
Site Class = D
Design Cat. = D
~-° Use Group = I
R = 6.5
Cd = 4
,.,,, W o = 3
M 6. Soil = 1500 PSF, Assumed bearing capacity
Concrete $ Reinforcing Steel:
1. All concrete work shall be per the 2006 IBC Chapter 19. Tolerances shall be per IBC Chapter
19, Section 07. Mixing, placement, and inspection shall be per Sections 03, 04, 05, and 06.
.v 2. All reinforcing shall be ASTM A615 Grade 60 except as shown on the plans.
3. Concrete shall be in accordance with ASTM 150.
--- fc = 2500 PSI @ 28 day
slump = 4" maximum, 6% Air entrained.
Steel:
1. Anchor bolts shall be ASTM A307 and will have a 3x3x1/4" plate washer.
Carpentry:
.-
-'- Project #2007249-A 10/2/2007
Page 12
1. 2X structural framing shall be #2 Douglas Fir.
4x structural members shall be #2 Douglas Fir.
" 6X members shall be #1 Douglas Fir.
2. Provide solid blocking in floor system below all bearing walls and point loads.
^~ 3. 2X joists shall be kiln dried and stored in a dry area prior to installation. The moisture content
of all wood shall be less than 15%.
4. Roof trusses shall be by apre-approved manufacturer and constructed according to the
specifications of the Truss Plate Institute. Truss shop drawings must be stamped by a
licensed engineer and be on site at the time of construction. Preliminary truss drawings must
be reviewed prior to construction. It is the truss manufacturer's responsibility to inform the
engineer of record of any changes from the preliminary truss lay-out.
Girder trusses to have a minimum of bearing studs equal to number of plies of truss. All
-~ girder trusses shall have Simpson HGT tie down at either end to match number of plies.
Truss manufactures are responsible for all bracing of the trusses including end wall bracing
and all other bracing between the building and the trusses unless specifically shown
otherwise on the drawings. Contractor to coordinate bracing with engineer of record as
required.
5. Glue laminated beams shall be 24F-V8 for cantilevered or continuous beams and 24F-V4 for
simple spans.
(Fb = 2,400 PSI)
(Fv = 190 PSI)
(E = 1,800,000 PSI)
(FcL = 650 PSI)
6. Continuous and cantilevered glue laminated beams shall not be cambered. All other glue
laminated beams shall be cantilevered for U480. See the framing plans for any exceptions.
-- 7. All manufactured lumber shall be by Boise Cascade and have the following structural
properties:
,~ Versa Lam (VL)
(Fb = 2,800 PSI)
(Fv = 280 PSI)
~- (E = 2,000,000 PSI)
(FcL = 750 PSI)
8. Sheathing at roof and floor shall be laid with face grain perpendicular to supports and end
joints staggered 4'-0" on center. Provide 1/8" space at panel edges as required by panel
manufacturers. Floor sheathing shall be nailed 6" o.c. edges and 12"field with 10d's and roof
sheathing shall be nailed 6" o.c. edges and 12" o.c field with 10d's unless otherwise noted on
.- the drawings.
9. Block and nail all horizontal panel edges at designated shear walls.
Hardware:
~•
b.. Project #2007249-A 10/2/2007
Page 13
All connection hardware shall be Simpson "Strong Tie". Connection hardware exposed to the weather orsoil
shall be treated as in steel above.
CAUTION:
M PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS. BRACE PER RECOMMENDATIONS.
CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS.
.•
..
..
.~•
r
..
..
~.
.~
C--- - ------ - __- ---- -- ---~'.~- -- --
II --- ~'-~• -- -
I
i Mae mml ~ i I ~ r I ,!'~ -~
U :wDi 1
--~--_ -i-- -- - - - -- {- ,~,,,_ I . ~,
--~ ~ ~ ~ , ~ ~ ae aon ~ ~ ~ I IHa~ _ ~
+ y
PANTRY '~ -; `-r•
EE LIB STORAGFIMECHANICAI. _ ~9 `~n ~ °n' ~
f ~ m,svn ~I -! -_.~-•~... I ~ b- nlgn naa~ ' m i ~ ~. _ »
\_ ! ~ ~ ~ - ~ ~~ PP Pu ~ receWClws now s I00~- - - N
~ ~ -~~~-~ ~ ~ _- - ~ ~,- ~ ' o
+? I PPCWgtlp gOpl - ~ N
'Pm' ~ t
~, ~ ---, ~ .~ ~' ..F~, -_ I '" ? KITCHEN fIIS~~ -- --- j0
I ~ _ ~ .. __~ ~. r' -I' I -_ ~ ~'
I ~~ 1~:
M+I aPrnuw n4 aow` !{-~_~ ~ '~..~~~I ..n~4-0 -f
F m ~ wco I ~ WOMENS RFSTROOM
,,II r"" s
_- ~2~ 177M~ r ~ .
r 'f-s
MPI
s
N
I
-- - _ ~,~ ( ~I ~ ~ Iraceiwo nsaxaax ~ ^~
~' ~~ L~, -- ~ - ~ -
racouwmsnoou ~") I GREAT ROOM ~ ~ ~ -
MASSAGE __ ~ ~ , -- '
.Ili - -EO11 ~' YaO{Upi~K ROOY ~ PPCE¢NO11q ROpl I ~ I
K i 4 ,a.w u ~ ~, _- I
m MEN'S~RESTI20DM ' ~ ~ ~ DINING ! ~ -
. :tot qA SUt epn ~ I LL ~~
57 Hacf ~ ~racEwlosMy Pew ~2 PIRI I ~ "'u e ~ i tal N ! I I ~~
asx STORAGE ~ ~d ~ ' _ 0
,vwn ~ .
I ~~ ~y,wrc 1 - -
- ~_ ~~ ABOVE BATIK - X09 ra CBLMOMSPOON ~ ~ ~ ~ ~
i~_ 1
q{QS '.9/' ~ Y
11j I,i11C 5V N - _ _ _ -__, -~
1 ' ' . r 91E_IIOA ', EFMKtl W,LL I ..
~ ... .{EV- __ -
~;-- - _ eA MUR •p~
YPIE 1~ ' /FOP FuBNC( I ~ 'M ~ ~ -
~ ~ ~j I' j - ~ - -`
'' ~ ~ ~ ~
"'°j l
1 ~ ~
~ IPOEPlB Tp B]Iq ~
I
Q
m
~ ~ I lld GrM oFrlcc I _,' P~ I I ~ I~
~~ 7,7s9a ~ fl5sgn I pOB ENTRY T (-ood ~ ~ W R _
yy vaca~nnn.sum~ -
i VA{ Pa OBIIMTIq FOOM 3?S SOB p~ ! -
b
~ I-~11 ~
- I ~ •~ sruairo Brle now I ~ I I ~_L-'_-
i i ~ I
l i v i } (~0T - ooc b I I~- _- _
1--~ - - - _ - .,, Bri Mpl sre non ara ion __
l~ - ~' II - - ~ III o
__ w
~ ~ ~ -~ I ~ ~ I'I I~ - - ~ ( ~ ~ N
~^~±`'" --+a'~-- - ~ ~ ~ III' I ~~~~!-1~, I ~ ~ 11~~7~~ ~~ n~~~~ I I ~ ~ o
i T ~ ~ I
I I ~ --a'-„+rz• z~s°~r.z^.-ra ~ k''''-~-c~m ~+~'~~rs_r. ~ ~
~r•mJ-r-e•<- - - +s'a•-- - ~ rs,rr r'`z'~'`~'•~`I+'-g'.-- --- +z'~^ -
- - - _~•_-'- 18'-8'.---
~-- Project #2007249-A
Title
Dsgnr:
•- Description
_ Scope:
~ Rev: 580006 -
User: KW-0607446, Ver5.8.0, 1•Dec-2003 -
`(c)1983-2003ENERCALC Engineering Software Timber Beam ~ Joist
10/2/2007
Date: 8:04AM, J2 OC1~0715
1
ode Ref 19~+,r•~001 NDS, 2000/2003 IBC
Beam A Beam B Beam C Beam D
Beam E
Beam F - ---• ......, ,•••
Timber Section
5.125x12 Beam G
Beam Width 6x8 VersaLam5.25x9.5
6x8
6x8
5
Beam Depth
ins
i
5'125
5.500
5
500 .125x10.5 VersaLam5.25x14
Le: Unbraced Length n
ft 12.000
2
00 7.500 9.500 .
7.500 5.500
7
500 5.125 5.250
Tlmber Grade .
bouglas FH
24F -
3.00
8.50
6.00 .
12
50 10.500 14.000
Fb -Basic Allow ,
V4 Douglas Fir -
Larch, No.2 Boise Casork
Versa Lam 2800
D°uglas Fir -
Lards
No.2 .
Douglas Rr -
Larch
N 2.00
Douglas Fir, 24F - 12.50
Boise Cascade,
Fv -Basic Allow
psi
2
875'0
2,800.0 ,
875
0 ,
o.2 V4 Versa Lam 2600
Elastic Modulus
ksi~ 240.0
1
80 170.0 190.0 .
170.0 875.0
170
0 2,400.0 2,800.0
Load Duration Factor
~ ,
0.0
1
150 1,300.0
2,000.0
1,300.0 .
1,300.0 240.0
1
800
0 190.0
Member Type
R .
GluLam 1.150
Sawn 1.150
M 1.150
1.150 ,
.
1.150 2,000.0
1
15
epetitive Status
~
N anuf/Pine
Sawn
Sawn
Gl
L .
0
o
NO
NO
NO u
am ManufJPine
Center Span Data No
NO
NO
Span
Dead Load ftl
#/ft 14.75
26 3.00 8.50
6.00
12.50
12
00
12
Live Load
I
#/ft 8.00
395.00
209.00
307
00
322.00
285.00
60.00 . .50
Point #1 DL
Ibsl
2
288
00 . 537.00 475.00 100.00 485.00 1
002
00
LL
°~ X Ibs ,
.
3,366.00 1,810.00
2,809.00 ,
.
1,108.00
- - ft~
- 2.000 4.250 1,630.00
Results Ratio = 0.8554 _
0
1345 -
0 - 6.000
Mmax
R enter
~°
in-k
289
53 . .8482 0.7935 0.7277
0.6332
0.9347
@ I
ft .
6.19 6.97
1.50 213.43
4
25 41.04
37.50
164.16
496
33
fb :Actual
Fb :Allowable
Psi
sis
2,353.9
2
7
135.1 .
2,702.7 3.00
795.9 6.25
727
3 6.00 .
6.00
p
B ,
51.7 1,004.6
3,186.3
1
003
0 .
99 1,743.2 2,894.1
fv :Actual endin OK
9
Bending OK
Bending OK ,
.
Bending OK 9.4
Bending OK 2 752 8
Be
di
•5
Fv :Allowable psil 223.2 16.4
160.6
65
7 n
ng OK Bend ng OK
_
Psi
~
276.0
Shear OK
195.5
Shear OK
218.5
She
K .
195.5 32.9
195.5 108.8
276
~
204.2
~
Reactions -
-- r O Shear OK
Shear OK
-_ _ '
Shear OK 218.5
Shear OK
_
@ Left End DL Ibs 3,954.26 313.50 2
323
50
LL
Max. DL+LL Ibsl
Ibs 5,822.72
9 460.50 ,
.
3,686.75 1,425.00 375.00 1,710.00 4,832.41
@ Right End DL
Ibs ,776.98
2
2 774.00 6,010.25 2,280.00 1,000.00 4
560
00 ~
b0
LL
M
Ibs ,
86.74
3,369.53 313.50
460.50 2,323.50
3
686
75
855.00
375.00 ,
.
1,710.00 11
942.
4
788
09
ax. DL+LL
___
Ibs
5,656.27
774.00 ,
.
6
010
25 1,425.00 625.00 2,850.00 ,
.
7
044.90
IeflectionS ,
.
2,280.00 1,000.00
Ratio OK Deflection OK Deflection OK Deflection O 4,560.00 ,
Center DL Defl
i K Defl ection OK Def lection OK De flection OK
UDefl Ratio nj -0.294
601.5 -0.002
23
757 9
-0'107
-0.033
-0.131
-0.149
-0
188
Center LL Defl in -0.433 ,
.0
002 956.0 2,177.8 1,144.0 963.8 .
797
2
UDefl Ratio
Center Total Defl ~
~ 408.3 .
16,174.0 -0.167
611.3 -0.055
1
306
7 -0.219 -0.249 .
0.277
Location in
ft -0.728 -0.004 -0.274 ,
.
-0.088 686.4
-0
350 578.3 541.8
UDefl Ratio l 7.080
243 2 1.500
9 4.250
3.000 .
6.250 -0.398
6
000 -0.465
I
,622.9
372.9
816.7
429
0 .
361
4 6.250
. . 322,6
cnr,n
Project #2007249-A
Titfe
Dsgnr:
Description
Scope
Timber Beam & Joist
10/2/2007
Jobj~aQe 1 b
Date: 8:15AM, 2 OC~07
3
~ft
Timber Member Informatio :
n ode Ref: 1997/ 2001 NDS, 2000/2003 IBC
2003
,
NFPA 5000. Base allowabl
Beam H Beam I beam
Timber Section I silo
Beam Width
ink
5
500 sxa
sxa
Beam Depth
inj .
9
500 5.500 5.500
Le: Unbraced Length ft .
6
00 7.500 7.500
Tlmber Grade
I . 2.00
6.00
Douglas Fir -
Larch
No
2 Douglas Fir - Douglas Fir -
Fb -Basic Allow
psis ,
.
875
0 Larch, No.2 Larch, No.2
Fv -Basic Allow . 875.0 875
0
Elastic Modulus psll
ksil 170.0
1,300.0 170.0
1
300
0 .
170.0
Load Duration Factor ,
. 1,300.0
Member Type
I 1.150 1.150
1.150
Repetitive Status I Sawn Sawn Sawn
_ No No No
Center Span Data
Span
Dead Load ft
~ 6.00
5.00
6.00
Live Load #/ft
#/ftl 479.00
705
00 232.00 135.00
---
ReSUItS .
_ 388.00 225.00
Ratfo= 0.7714 0.4486 0.3759 ---
Mmax @ Center in-kj 63.94 23
25
~° X - ftl 3.00 .
2.50 19.44
3
00
fb :Actual
Fb :Allowable psl~
i 772.8 450.9 .
377.0
ps
I 1,001.9 1,005.1 1,003
0
fv :Actual Bending OK
is Bending OK .
Bending OK
Fv :Allowable ps
psis 75.9
19
42.4
31.1
5.5
Shear OK 195.5
Shear OK 195.5
Shear OK
1
d
@ Left End DL
LL
Max. DL+LL
@ Right End DL
LL
Max. DL+LL
reflections
Center DL Defl
UDefl Ratio
Center LL Defl
UDefl Ratio
Center Total Defl
Location
UDefl Ratio
7.00 m- -
580.00
405.00
5.00 970.00 675.00
2.00 1, 550.00 1, 080.00
x.00 580.00 405.00
i.00 970.00 675.00
?.00 1,550.00 1, 080.00
OK Deflection OK Deflection OK
-0.027 -0.013 -0.016
2,633.4 4,623.0 4,597.6
-0.040 -0.022 -0.026
1,789.2 2,764.2 2,758.6
-0.068 -0.035 -0.042
3.000 2.500 3.000
1,065.4 1,729.9 1,724.1
Page 1 of 2
BELLA HOUSA VILLAGE, LLC
Walk-Through Punchlist
issued on November 20, 2007
Dear Community Development Department,
Thank you for conducting Bella Housa's initial punchlist in Nov. 2007.
Presently, of all punchlist items #1 - #42, item no.'s #1 - #30, #33, #34, #37 - #39, #42 are
completed.
The balance of punchlist items #31, #32, #35, #40, #41 have `Intent of Action" letters provided
~~ith this letter.
Please review the pending punchlist items for acceptance, thank you.
Sincerely Yours, /~~///~/
~ 1
Merle Hom, Managing Member
Bella Housa Village, LLC
(360) 400-7437 office
(360) 400-7450 fax
MerleHorn~Comcast net
~'yt
. _u
i ~ I-
j~
. ~ ~J
,~ x_
R
- - `•.
}
MERLE HOM, Member Manager
Bella Housa Village, LLC
,~ ~_.
Stay Healthy, Active, & Sma~7
14948 89~^ Ave SE Fax (360) 400-7450
Yelm, WA 98597 www.BellaHo~sa com
Office (360) 400-7437 MerleHom~~~C~~.n;~~~astnel
Page 2 of 2
BELLA HOUSA VILLAGE, LLC
Intent of Action Letters
for Walk-Through Punchlist
issued on November 20, 2007
Remedy of item no. 31 as follows;
The bare wires and conduits exposed on lot# 14 and Recreation Center tract are
only temporarly placed for irrigation system. The final burial of conduit sleeving will be
placed at completion of the Rec, Center. The control panel for the irrigation system will
be permanently affixed to the Rec. Center building as well. This is our intent for remedy
to this punchlist item.
Remedy of item no. 32 as follows;
The stop bars will be installed when the ecology blocks are removed. The ecology
blocks are situated just infront of the area where the stop bars are to be located. These
blocks are placed for the purposes of site security, and have worked well so far.
Management of Bella Housa would like to eliminate the possibility of defacing these stop
bars during the course of site construction. We intend to remedy this potential problem by
installing the stop bars at final occupancy of Rec. Center.
Remedy of item no. 35 as follows;
The crack in the mail box slab at the furthest East end of development will be
repaired when the concrete pour for the Rec. Center patios are completed in roughly
three-weeks, and or April 30, 2008. We intend to remedy this item by reinstalling an
epoxy joint sealer, and or full removal and re-install of the mail box slab between
expansion joints.
Remedy of item no. 40 as follows;
The landscaping and' irrigation around the Rec. Center will completed in the
regular course of construction sequence so that damage of surrounding area and owner
costs are minimized, and or eliminated. Installation tentatively scheduled July 11, 2008.
Remedy of item no. 41 as follows;
The Rec. Center patio seating and adjacent landscaping will completed in the
regular course of construction sequence so that damage of surrounding area and owner
costs are minimized, and or eliminated. Installation tentatively scheduled July 11, 2008.
City of Ye m
November 20, 2007
Merle Hom
14948 89'h Avenue. S.E.
Yelm, WA 98597
RE: Bella Housa -Initial Punchlist
Dear. Merle:
Community Development Depcxrtment
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
~, ik
J~u~'"
~~ C~+'e~P r~('ad~"
~ . ~~~~
d~
'jam `
The City of Yelm has completed the initial punchlist items for Bella Housa. Please see
comments listed below:
Water Department Comments:
1. Lots 1 & 2 raise meter setters and clean out box, setters too low
2. Lots 3 8 4 raise meter setters and clean out box, setters too low
3. Lots 5 ~ 6 raise meter setters and clean out box, setters too low
4. Lots 7 8 8 raise meter setters and clean out box, setters too low
5. Lots 9 & 10 clean out meter box
6. Lots 11 & 12 locate meter box, unable to find, covered
7. Lot 13 meter setter to high, must be lowered
8. Lots 14 & 15 raise meter setters and clean out, tree is too close must have minimum of 3
foot separation
9. Lots 16 & 17 raise meter setters and clean out box, setters too low
10. Lots 21 & 22 clean out meter box and spread setters apart
11. Lots 23 & 24 clean out meter box
12. Lots 34 & 35 lower meter setters, setters too high
13. Lots 36 & 37 replace meter setters and lower, setters are too high and both are bent one
is kinked
14. Lot 38 sewer air release is to close to meter setter, must have minimum of 10 foot
1~ ~~D separation
~ 15. Lots 40 & 41 square meter setters in box
16. Lots 48 & 49 NO WATER to meter setters, raise meter setters, setters too low
17. Lots 50 & 51 square meter setters in box
18. Lot 52 lower meter setter and clean out box, setters too high
19. Lot 4 irrigation hose stub to close to sewer must have minimum 10 foot separation
20. Lot 7 irrigation control valve to close to sewer, must have minimum 10 foot separation
21. Lot 13 irrigation control vale to close to sewer, must have minimum 10 foot separation
D t)22. Locate meter box and setter for Club House, unable to find
23. Lot 15 8 16 irrigatio ~ control box and hose stub to close to sewer, must have minimum.
10 foot separation
24. Lot 19 irrigation cont I box to close to sewer, must have minimum 10 foot separation ~~
25. Lot 22 irrigation control box to close to sewer, must have minimum 10 foot separation
(360) 958-3835
(360) 458-3]44 FAX
www.ci.yelm.wa.us
26. Lot 36 irrigation control valy
Sewer a to close to
bC,~ 27. '~epartrnent: Sewer, must
Air release v have mini
insulation aloe at sta. 7+ ~ murn 10 foot se
28. All irri °n lid irate ' 42.9 has partition
gation lines andr needs to b a broken
and 18 appurtena a fixed riser, the lid
vert'cal inches races needs
or they need to b need to have a se Scre
e sleeved. partition ws and the
GU29. u~nDeVelop-nent Co °f 10 horizontal feet
pp 30~ out all storm catcmments:
g up the h basins
Bare wires an~ade behind side and manholes.
walks, 1 ~,
These will conduits are belo ~~/
~ to need to be re exposed above w sidewalk. u~'' ~.
33 bars re re moved if to ground at ~./
~ move all quired at both ends p0ra ~Y or buried ' me prOpOSed
;~ Barricades re aterials adjacent to lots 791 Ave. Burne tpermanent, club house location,
Crack ' quired and Rd. and Mt. Uew Rd~---- .
re 'n sidewalk b at both ends of side 8'
placed from joint Y mail boxes walks that do
37 Installation of tOJoint. C.F '.painted red. not continue.
~ gates at both ~ This will need to
pproved landsca ends have
of CL pe plans show of pathway is re the sidewalk panel
a (Males " the installatio quired.
ccent trees.. ply Sentine/" n of street trees
. Street ~ and Gallery pear within the
trees must bee ita e (f'Yrus ca//e plat consisting
3 Recreation Ce elect to deter mss. r1'ana chantic%er'
Patio/S rater landscaping to bem'ne Species. ~ aS the
eating area and tables nstalled
Cto the recreation center t0 alon prior to final
'Clean u be installed ith the associated la plat apprOVal.
down to 3landscape areas alo prior to final plat a ndscaping proposed
feet. rag either side of the pproval. adjacent
pathway where the pathway narrows
~u are ready for a reins
additional questions pection please
~i.yelm.wa.us, or comments pleasleStevnO arrington at 360- 8423
do hesitate to c 458-
all or contact If you
me at
~-
'ngton
Bering Inspector
of Community Devefop~ent
Page 2 of 2