Loading...
05-0456 Civil No 2 031308 Trump Plat Final Punchlist from walk thru conducted on 3/13/08 Needs to be completed. Please complete any striping on roadways that may be required.  Replace any damaged or removed striping with new. In progress n progress. Landscaping needs to be completed through out the entire plat. In progress. Clean up left over material and debris through out entire plat. Clean sidewalks. In progress. Hydroseed the required areas of plat per plans. In progress. Hydroseed storm pond area per plans. Needs completed. Clean and sweep streets. Needs completed. Complete open spaces, play ground and picnic areas. Steve Harrington Engineering / Civil Inspector