05-0456 Public Works No 2 031808 From: Deonne Hardy
Sent: Tuesday, March 18, 2008 5:04 PM
To: Steve Harrington
Cc: Tim Peterson; Jim Gibson; Kevin Ray
Subject: RE: Trump Plat Sidewalk Inspection
?HI inspected Trump Plat sidewalks on
3/18/2008 and here are my findings:
1. At the end of
Stella CT, the sidewalk needs to return to hard surface. Present time it dead ends into grass.
2. Remove plastic from truncated domes.
3. On Longmire, North end, back side of walk, bring up grade 1” from top of walk to 1 foot.
4. On Trump, on the East end, back side of walk, bring up 1” from top of walk to 1 foot.
5. No cross roads signs on Cullens and Trump.
For John Edwards
Deonne Hardy
Public Works Department
Administrative Assistant
901 Rhoton Road
/POB 479
Yelm
, WA 98597
(360) 458-8406
Fax: (360) 458-8417
deonneh@ci.yelm.wa.us
From: Steve Harrington
Sent: Friday,
March 14, 2008 3:06 PMTo: Edward Smith; John Ivey; Jon Yanasak; Deonne Hardy; Kevin Ray; Nisha Box
Cc: Jim Gibson; Tim Peterson
Subject: Trump Plat Final Close Out Inspection
Please find this e-mail to serve as notice to conduct a 2nd and final inspection for the Trump Plat. We would like to have this inspection completed and all comments back by Friday
March 21, 2008. Please find a copy of the last punchlist attached.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of
Yelm
Office (360) 458-8423 / Field (360) 561-4264