Loading...
05-0456 Public Works No 2 031808 From: Deonne Hardy Sent: Tuesday, March 18, 2008 5:04 PM To: Steve Harrington Cc: Tim Peterson; Jim Gibson; Kevin Ray Subject: RE: Trump Plat Sidewalk Inspection ?HI inspected Trump Plat sidewalks on 3/18/2008 and here are my findings: 1.  At the end of Stella CT, the sidewalk needs to return to hard surface.  Present time it dead ends into grass. 2.  Remove plastic from truncated domes. 3.  On Longmire, North end, back side of walk, bring up grade 1” from top of walk to 1 foot. 4.  On Trump, on the East end, back side of walk, bring up 1” from top of walk to 1 foot. 5.  No cross roads signs on Cullens and Trump. For John Edwards Deonne Hardy Public Works Department Administrative Assistant 901 Rhoton Road /POB 479 Yelm , WA 98597 (360) 458-8406 Fax: (360) 458-8417 deonneh@ci.yelm.wa.us   From: Steve Harrington Sent: Friday, March 14, 2008 3:06 PMTo: Edward Smith; John Ivey; Jon Yanasak; Deonne Hardy; Kevin Ray; Nisha Box Cc: Jim Gibson; Tim Peterson Subject: Trump Plat Final Close Out Inspection Please find this e-mail to serve as notice to conduct a 2nd and final inspection for the Trump Plat.  We would like to have this inspection completed and all comments back by Friday March 21, 2008.  Please find a copy of the last punchlist attached.  Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264