05-0456 Water Review No 2 022707.doc From: Edward Smith
Sent: Wednesday, March 07, 2007 9:16 AM
To: Tim Peterson
Cc: Deonne Hardy; Jim Gibson; Kevin Ray
Subject: Plan Review, Public Works.doc
Trump Plat
? City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date 27/Feb/2007 Page 1 of 2
Location: Trump Plat Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm will order and install them. The project will not be final until the City of
Yelm has received the payment in full for the fire hydrants locks.
2. The existing well or wells need to be decommissioned per DOE and DOH regulation and a copy of the report send to the City of Yelm water department.
3. The water meter to the storm pond for irrigation needs to have a Double Check Valve Assembly behind it. And what size water meter is for this irrigation system?
4. On Trump Street at station 2 + 64.06, will need to add a three eight inch gate valve.
5. Need to increase the two inch water main to a six inch water main to get enough flow to the eight homes.
6. An Air Release will need to be added at the end of Stella Ct.
7. An Air Release will need to be added at the high point on Trump Street toward Cullen’s Street.
8. The sewer or water main will need to be sleeved at Longmire Street. This is at the existing sewer main is.
Reviewed by: Edward Smith, John I,
Signed by: Edward Smith