Loading...
RE Trump Plat SD PipeIPM.Note RE: Trump Plat SD Pipe RE: Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Trump Plat SD Pipe Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH 'Bob Tauscher' Trump Plat SD Pipe 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Bob: I thought your contractor was making the request for ADS, for both conveyance and infiltration system materials? We are fine with ADS. If you do change the corrugated metal pipe in the storm infiltration pond to ADS as well, could you up date the request letter to reflect that change also and send it to us by e-mail and also follow up with a hard copy via mail? This should take care of it as long as you follow up with the changes by adding them on the plans for the asbuilts. Thank You, Steve Harrington Engineering / Civil Inspector Yelm Community Development Department _____ From: Bob Tauscher [mailto:bob@jwmorrissette.com] Sent: Friday, June 08, 2007 9:40 AM To: Steve Harrington Cc: Scott L Ritter; Jim Gibson Subject: RE: Trump Plat SD Pipe Steve, So are you saying it is ok to install the ADS pipe with the letter I sent or do you need something further? Please let me know. As far as the infiltration gallery, I have not been asked to submit a request for a revision. Would a letter requesting the change be sufficient if the desire is to revise the gallery piping? Thanks Bob Robert E. Tauscher P.E. Jerome W. Morrissette & Associates Inc., P.S. 1700 Cooper Point Rd SW #B-2 Olympia, WA 98502-1110 Phone 360-352-9456 Fax 360-352-9990 Cell 360-481-4145 bob@jwmaeng.com or bob@jwmorrissette.com _____ From: Steve Harrington [mailto:steveh@ci.yelm.wa.us] Sent: Friday, June 08, 2007 8:55 AM To: Bob Tauscher Subject: RE: Trump Plat SD Pipe Bob: I talked to Kenny yesterday about the ADS storm pipe instead of PVC while looking at the plan’s, I discovered the corrugated metal for the infiltration gallery. I mentioned that this would also be o.k. for ADS if submitted and requested by the Engineer or Design Team. I referred him on the proper procedures or steps to take to make the change. I feel that this change request is fine. Thanks, Steve _____ From: Bob Tauscher [mailto:bob@jwmorrissette.com] Sent: Friday, June 08, 2007 8:36 AM To: Steve Harrington Cc: Scott L Ritter; Jim Gibson Subject: Trump Plat SD Pipe Steve, Attached is a letter requesting the City allow a change to the SD pipe specified on the Trump Plat project. A hard copy will be sent to you in the mail. Please review at your earliest convenience. Thanks Bob Robert E. Tauscher P.E. Jerome W. Morrissette & Associates Inc., P.S. 1700 Cooper Point Rd SW #B-2 Olympia, WA 98502-1110 Phone 360-352-9456 Fax 360-352-9990 Cell 360-481-4145 bob@jwmaeng.com or bob@jwmorrissette.com <DC90029353CCCD468AA2A2858FFCD8F528F7AE@server1.ci.yelm.wa.us> <005e01c7a9eb$bc84ffb0$05fea8c0@bobsdell> RE%3A Trump Plat SD Pipe-2.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh 'Bob Tauscher' SMTP bob@jwmorrissette.com 'Bob Tauscher' Bob Tauscher