MDNS Signed 001SEPA NO: 05-0456
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Proponent: RDS Design, LLC.
Description of Proposal: Subdivide 3.22 acres into 18single-family residential lots. The project
includes the construction of stormwater facilities, interior streets, and
street improvements to Cullens Road, and Longmire Street.
Location of the Proposal: The project site is located at 301 Longmire Street, North of Yelm
Avenue West (SR 510), between Longmire Street and Cullens Road.
SectionlTOwnshiplRange: Section 19/24, Township 17 North Range 2E / 1 E, W.M.
Threshold Determination: The City of Yelm as lead agency for this action has determined that
this proposal does not have a probable significant adverse impact on
the environment. Therefore, an environmental impact statement (EIS)
will not be required under RCW 43.21C.030(2)(c). This tlecision was
made after review of a completed environmental checklist and other
information on fle with the lead agency. This information is available
to the public on request.
Conditions/Mitigating Measures: SEE ATTACHED
Lead agency: City of Yelm
Responsible Offcial: Grant Beck, Community Development Director
Date of Issue: June 5, 2006
Cggmm e ~ e June 19, 2006
.Aooe eadli June 26, 2006
Development Director
Thi igated Determination of NonSignifcance (MDNS) is issued pursuant to Washington Administrative
Code 197-11-340 (2). Comments must be submitted to Tami Merriman, Community Development
Department, at City of Yelm, 105 Yelm Avenue West, P.O. Box 479, Yelm, WA 98597, by June 19, 2006,
at 5:00 P.M. The City of Yelm will not act on this proposal prior June 26, 2006, at 5:00 P.M.
You may appeal this determination to the Yelm Hearing Examiner, at above address, by submitting a
written appeal no later than June 26, 2006 at 5:00 P. M. You should be prepared to make soecifc factual
objections. Contact Grant Beck, Community Development Director, to learn more about the procedures
for SEPA appeals. This MDNS is not a permit and does not by itself constitute project approval. The
applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction
permits which may include but are not limited to the City of Yelm Comprehensive Plan, Zoning Code (Title
17 YMC), Critical Areas Code (Chapter 14.06 YMC), Storm water Drainage Design and Erosion Control
Manual (DOE), Uniform Builtling Code, State Environmental Policy Act (SEPA) (Title 14 YMC), Road
Design Standards, Platting and Subdivision Code (Title 16 YMC), and the Shoreline Master Program.
DO NOT PUBLISH BELOW THIS LINE
PublisheB. Nisqually Valley News, Friday, Juna 9, 2006
Posletl in public areas: Montlay, June 5, 2006
Copies to: All agencies/cilizens on SEPA mailing list and adjacent properly owners
Dept. or Ewlogy wlchecklist
ATTACHMENT
SEPA Case Number 05-0456
Findings of Fact
This Mitigated Determination of Non Significance is based on the project as proposed
and the impacts and potential mitigation measures reflected in the following
environmental documents:
• Environmental Checklist (January 2006, Jerome W. Morrissette & Associates, P.S.)
• Preliminary Storm Drainage Report (January 2006, prepared by Jerome W.
Morrissette & Associates, P.S.)
2. The City of Yelm has adopted a concurrency management system as required by the
Growth Management Act. Chapter 15.40 YMC (concurrency Management) is designed
to ensure that the improvements required to support development are available at the
time of development. A concurrency determination may be issued for a proposal as it
relates to transportation issues when: the development provides on-site frontage
improvements; the project makes off-site improvements as necessary to provide for the
safe movement of traffic; and the project makes a contribution to projects identifed the
six year transportation improvement program in the form of a Transportation Facilities
Charge.
3. Chapter 14.12 YMC requires the dedication of open space for all residential
development. Section 14.12.050 YMC lists four (4) attributes for qualification of open
space.
4. The Yelm School District has adopted a school mitigation requirement based on the
demand that new residential units create for additional school services and facilities.
Additional demands on the school system will be mitigated through the requirement that
the developer enter into a mitigation agreement with the District.
Mitigation Measures
1. The developer shall mitigate transportation impacts based on the new residential P. M.
peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall
be based on 1.01 new peak hour trips per residential unit. The proponent will be
responsible for a TFC of $757.50 per dwelling unit which is payable at time of building
permit. Credit should be given for the existing single-family dwellings.
2. Prior to final subdivision approval, the developer shall complete the following
transportation improvements:
a. The east half of Cullens Road shall be improved to City Standards for a
Neighborhood Collector along the property frontage.
b. Cullens Road shall be improved to provide lwo 12 foot drive lanes from the northwest
corner of the property to the intersection of Cullens Road and St. Hwy 510 (Yelm
Ave.) This Cullens Road improvement is a condition of a different plat approval
called Cherry Meadows. If the Cherry Meadows subdivision does not complete the
Cullens Road widening prior to final plat approval for this subdivision, this plat
approval will be conditioned to limit final plat approval to after the Cherry Meadows
improvements are complete.
c. The west half of Longmire Street shall be improved to City Standards for a Local
Access Residential along the property frontage.
d. Longmire Street shall be improved to provide lwo 12 foot drive lanes from Coates
Road to the SR 510 (Yelm Avenue) and overlaid with a 2 inch, Class B overlay of
asphalt.
e. All interior streets shall be improved to City Standards for a Local Access
Residential.
3. Temporary erosion control systems to be approved by the City of Yelm.
4. The developer shall provide at least 5% of total acreage as qualified and usable open
space.
5. The developer shall enter into an agreement with Yelm Community Schools to mitigate
project impacts to the School District.