8320 Review No.2 122602December 26, 2002 Craig Deaver C.E.S. Northwest, Inc. 5308 12th St. E. Suite B Fife, Washington 98424 RE: Civil Engineering Review No. 2 Yelm Community Center Expansion City of Yelm Project No. SPR-02-8320-YL Dear Mr. Deaver: I have reviewed the plans submitted on December 11, 2002 and dated 12/5/02. (Date of PE stamp). The following comments are from the above referenced plans and need to be addressed on the future submittal. I have organized these comments by general category. If you have any questions I have also included a set of redlined plans to clarify these comments. Sewer Plans: No comments at this time. Water Plans: All buildings need to have fire hydrant coverage. Each building must have fire hydrant coverage within 150’ of the building and access to each fire hydrant. The area behind the “existing community services center” in not fully covered. You need an irrigation meter on Crystal Springs road for the planter strip irrigation. A backflow prevention device is also required by City code. Please show on the plans. The City of Yelm’s cross connection control specialist has reviewed the plans. You will be required to install a double check valve for both new water meters and a double check valve for the existing water meter. Provide fire hydrant flow calculations for the project. The required fire flow is 2250 gpm @ 20 psi. Temporary Erosion and Sedimentation Control Plan: No comments at this time Stormwater Report: No comments at this time. Roadway and Stormwater Plans (Crystal Springs Road): No comment at this time. Grading and Stormwater Plans: No comments at this time. Misc. Information: The dumpster pad and location needs to be reviewed by Lemay, Inc. Please submit a copy of the site plan to Ric Thompson at Lemay, Inc. His phone number is 253-539-0068. You are required to submit a signed site plan from Lemay for CCD review and approval. The construction plans can’t be signed until this documentation is reviewed. The City of Yelm Design Guidelines requires the refuse enclosure to be constructed with architectural compatible materials to the buildings. Please submit the elevations, specifications and dimensions for review and approval. The irrigation and landscape plan still need to be submitted. Conditions of Approval: Transportation: To be paid at Building Permit Completed with the construction plans Water: Water usage calculations need to revised and resubmitted (original calcs. came from HultzBHU) Sewer: Same calculations will be utilized for sewer Completed with the construction plans Stormwater: Completed with the construction plans Completed with the construction plans Completed with the construction plans Not completed. Parking: Completed with the construction plans Completed with the construction plans Fire: Plans will be per fire code Design Guidelines and Landscaping: Not completed Not completed Not completed Not completed Not completed Not completed Refuse: Not completed Completed with construction plans Completed with construction plans Misc. Bill of Sale and Easement documents will be required for water and sewer lines and services, step tanks and controllers. The changes listed above should be made before the mylars are sent to the city. I will be willing to review any questions you may have by way of fax, to be sure everything is covered before you resubmit the mylars. When you resubmit your package, please send two sets of revised mylar drawing sets, two stormwater reports with the engineers stamp, 1 set of ½” scale drawings and the AutoCAD files on a CD. I will return one set of mylars to you for your records. The city inspectors will need 4 sets of signed plans for the construction phase. Please send these after you receive your signed mylars. If you have any questions or concerns please call me at (360) 458-8438. Respectfully City of Yelm Community Development Jim Gibson Development Review Engineer Cc: Grant Beck Tim Peterson Enc: