Loading...
RE Willow Glen 3 Second Walk Finals # 2 Public Works Report docIPM.Note RE: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc RE: Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Edward Smith Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server I will do that. _____ From: Edward Smith Sent: Thursday, July 05, 2007 3:40 PM To: Steve Harrington Subject: RE: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Steve, can you include me in the emails you send to Smitty, it’s a pain having to check his emails for things coming up when he isn’t here. Thanks, John Ivey _____ From: Steve Harrington Sent: Tuesday, July 03, 2007 10:08 AM To: Edward Smith Cc: Jim Gibson Subject: RE: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Smitty: Skook or Loren from Willow Glenn 3, were supposed to get in touch with the water dept. for inspection of the water service line to the office. I know Skook had it disconnected and was working on the tie-in to the new water service a couple of weeks ago. He knows he was supposed to get in touch with the water dept. for inspect. Thanks, Steve _____ From: Edward Smith Sent: Tuesday, July 03, 2007 9:58 AM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Willow Glen 3 Second walk throught for water. _____ City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Public Works Inspection Report Date: #/July/2007 Page 1 of 1 Location: Willow Glen 3 Department: Water Contractor: YPD Rep: Walter 1. The developer is responsible for the cost of the fire hydrants locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. Has this been paid? 2. Has the temporary water service from the well to the job/office been discontinued from the source? 3. Need to raise the meter setters for lot 42 and 43. Inspected by: John I and Tim Signed by: Edward Smith <DC90029353CCCD468AA2A2858FFCD8F528F828@server1.ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F50513E2@server1.ci.yelm.wa.us> RE%3A Willow Glen 3 Second Walk Finals %23 2 Public Works Report.doc-2.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Smitty smitty@ci.yelm.wa.us smitty Public Works Edward Smith Edward Smith image001.gif .gif image001.gif image001.gif image/gif image001.gif@01C7BF1A.F1E35190 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C7BF1A.F1E35190 image003.gif .gif image003.gif image003.gif image/gif image003.gif@01C7BF1A.F1E35190 image004.gif .gif image004.gif image004.gif image/gif image004.gif@01C7BF1A.F1E35190