Loading...
Re-Inspect of Willow Glenn Punchlist itemsIPM.Note Re-Inspect of Willow Glenn Punchlist items Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Re-Inspect of Willow Glenn Punchlist items Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson; Tim Peterson Jon Yanasak; Edward Smith; Deonne Hardy; Nisha Box Re-Inspect of Willow Glenn Punchlist items 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Please find attached are the few punchlist items that need to be re-inspected @ Willow Glenn 3. Sewer has no punchlist items. Public Works has 2 items. Landscaping has 4 items and Water has 6 items. I would like to make a request, to try and have these items re-inspected as soon as possible. I appreciate everyone’s effort during this busy time of the year. Your help is greatly appreciated. Thank you, Steve Harrington <DC90029353CCCD468AA2A2858FFCD8F528F817@server1.ci.yelm.wa.us> Re-Inspect of Willow Glenn Punchlist items.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh 05-0345 Final Plat Punchlist 05-0345 Final Plat Punchlist Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg 458-8438 Community Development Jim Gibson Jim Gibson Gibson Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim Public Works Tim Peterson Tim Peterson tim Jon Yanasak EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Jony jony@ci.yelm.wa.us jony Public Works Jon Yanasak Jon Yanasak jony Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Smitty smitty@ci.yelm.wa.us smitty Public Works Edward Smith Edward Smith smitty Deonne Hardy EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne deonne@ci.yelm.wa.us deonne Public Works Deonne Hardy Deonne Hardy deonne Nisha Box EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Nishar nishab@ci.yelm.wa.us nishab Nisha Box Nisha Box NISHAR 05-0345 Final Plat Punchlist.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 June 6, 2007 Yelm Property Development P.O. Box 2950 4910 Mt. View Road Yelm, WA 98597 RE: Willow Glenn III Estates Subdivision – SUB-05-0345-YL Preliminary Walk Thru Mr. Wade: The City of Yelm Community Development Department has completed a Preliminary Walk Thru of the project site and listed some items that will need to be completed. The following are items that need to be addressed: Engineering Comments: Need Stop Bars @ Stop Signs. Need striping street frontage improvements on Grove Road. Landscaping Comments: Hydroseeding is required throughout the plat. Replace the accent tree on the north frontage on Grove Road. Replace trees in front of lots 1, 20, and 27. The evergreen trees within the storm ponds appear to be failing. If they continue to deteriorate during the process of our review, they will need to be replaced. Water Comments: 1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2.   Move the meter box back and straighten out setters for lots 40 and 41. 3.   Need too raise meter box for lots 42 and 43. 4.   Need to clean out the irrigation meter setter at the end of Green Leaf Ct. 5.   Need to lower the meter setters for lots 54 and 55. 6.  Need to discontinue temporary water service from the well to the job/office, and disconnect it from the source. Please provide Water Department with a copy of the well abandonment report. Sewer Comments: The Sewer Department has no comments at this time. Street Comments: 1. On the back side of all walks, remove all large rocks and bring grade up 1inch and 1 foot of back of sidewalk. Please review these items. If you have any questions or comments, please call me at (360) 458-8423 and I will be happy to further assist you. Respectfully, City of Yelm Community Development Steve Harrington Engineering / Civil Inspector steveh@ci.yelm.wa.us .doc 05-034~2.DOC 05-0345 Final Plat Punchlist.doc