Loading...
RE Willow Glen 3 Second Walk Finals # 2 Public Works Report doc (10)IPM.Note RE: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc RE: Steve Harrington Edward Smith Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Steve Harrington Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server Steve, can you include me in the emails you send to Smitty, it’s a pain having to check his emails for things coming up when he isn’t here. Thanks, John Ivey _____ From: Steve Harrington Sent: Tuesday, July 03, 2007 10:08 AM To: Edward Smith Cc: Jim Gibson Subject: RE: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Smitty: Skook or Loren from Willow Glenn 3, were supposed to get in touch with the water dept. for inspection of the water service line to the office. I know Skook had it disconnected and was working on the tie-in to the new water service a couple of weeks ago. He knows he was supposed to get in touch with the water dept. for inspect. Thanks, Steve _____ From: Edward Smith Sent: Tuesday, July 03, 2007 9:58 AM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Willow Glen 3 Second walk throught for water. _____ City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Public Works Inspection Report Date: #/July/2007 Page 1 of 1 Location: Willow Glen 3 Department: Water Contractor: YPD Rep: Walter 1. The developer is responsible for the cost of the fire hydrants locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. Has this been paid? 2. Has the temporary water service from the well to the job/office been discontinued from the source? 3. Need to raise the meter setters for lot 42 and 43. Inspected by: John I and Tim Signed by: Edward Smith <DC90029353CCCD468AA2A2858FFCD8F50513E2@server1.ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F50513E1@server1.ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F52CD9F4@server1.ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F52CD9F4@server1.ci.yelm.wa.us> RE%3A Willow Glen 3 Second Walk Finals %23 2 Public Works Report.doc.EML Edward Smith Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh Steve Harrington Steve Harrington image001.gif .gif image001.gif image001.gif image/gif image001.gif@01C7BF1A.C0190AB0 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C7BF1A.C0190AB0 image003.gif .gif image003.gif image003.gif image/gif image003.gif@01C7BF1A.C0190AB0 image004.gif .gif image004.gif image004.gif image/gif image004.gif@01C7BF1A.C0190AB0