Re-Inspect of Willow Glenn Punchlist items (2)IPM.Note
Re-Inspect of Willow Glenn Punchlist items
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Re-Inspect of Willow Glenn Punchlist items
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jim Gibson; Tim Peterson
Jon Yanasak; Edward Smith; Deonne Hardy; Nisha Box
Re-Inspect of Willow Glenn Punchlist items
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Please find attached are the few punchlist items that need to be re-inspected @ Willow Glenn 3. Sewer has no punchlist items. Public Works has 2 items. Landscaping has 4 items and
Water has 6 items. I would like to make a request, to try and have these items re-inspected as soon as possible. I appreciate everyone’s effort during this busy time of the year.
Your help is greatly appreciated.
Thank you,
Steve Harrington
<DC90029353CCCD468AA2A2858FFCD8F528F817@server1.ci.yelm.wa.us>
Re-Inspect of Willow Glenn Punchlist items.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
05-0345 Final Plat Punchlist
05-0345 Final Plat Punchlist
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
Public Works
Tim Peterson
Tim Peterson
tim
Jon Yanasak
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Jony
jony@ci.yelm.wa.us
jony
Public Works
Jon Yanasak
Jon Yanasak
jony
Edward Smith
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Smitty
smitty@ci.yelm.wa.us
smitty
Public Works
Edward Smith
Edward Smith
smitty
Deonne Hardy
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne
deonne@ci.yelm.wa.us
deonne
Public Works
Deonne Hardy
Deonne Hardy
deonne
Nisha Box
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Nishar
nishab@ci.yelm.wa.us
nishab
Nisha Box
Nisha Box
NISHAR
05-0345 Final Plat Punchlist.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
June 6, 2007
Yelm Property Development
P.O. Box 2950
4910 Mt. View Road
Yelm, WA 98597
RE: Willow Glenn III Estates Subdivision – SUB-05-0345-YL
Preliminary Walk Thru
Mr. Wade:
The City of Yelm Community Development Department has completed a Preliminary Walk Thru of the project site and listed some items that will need to be completed.
The following are items that need to be addressed:
Engineering Comments:
Need Stop Bars @ Stop Signs.
Need striping street frontage improvements on Grove Road.
Landscaping Comments:
Hydroseeding is required throughout the plat.
Replace the accent tree on the north frontage on Grove Road.
Replace trees in front of lots 1, 20, and 27.
The evergreen trees within the storm ponds appear to be failing. If they continue to deteriorate during the process of our review, they will need to be replaced.
Water Comments:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the
City of Yelm has received the payment in full for the fire hydrant locks.
2. Move the meter box back and straighten out setters for lots 40 and 41.
3. Need too raise meter box for lots 42 and 43.
4. Need to clean out the irrigation meter setter at the end of Green Leaf Ct.
5. Need to lower the meter setters for lots 54 and 55.
6. Need to discontinue temporary water service from the well to the job/office, and disconnect it from the source. Please provide Water Department with a copy of the well abandonment
report.
Sewer Comments:
The Sewer Department has no comments at this time.
Street Comments:
1. On the back side of all walks, remove all large rocks and bring grade up 1inch and 1 foot of back of sidewalk.
Please review these items. If you have any questions or comments, please call me at (360) 458-8423 and I will be happy to further assist you.
Respectfully,
City of Yelm Community Development
Steve Harrington
Engineering / Civil Inspector
steveh@ci.yelm.wa.us
.doc
05-034~2.DOC
05-0345 Final Plat Punchlist.doc