Willow Glenn III is requesting a walk through of Development (2)IPM.Note
Willow Glenn III is requesting a walk through of Development
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Willow Glenn III is requesting a walk through of Development
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jim Gibson; Tami Merriman; Tim Peterson; Gary Carlson
Edward Smith; Jon Yanasak; Nisha Box
Willow Glenn III is requesting a walk through of Development
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Please see attachment.
Thank you,
Steve Harrington
City of Yelm, Engineering Civil Inspector
PO Box 479 Yelm,WA. 98597
Ph. 360.458.8423 Fx. 360.458.3144
<mailto:steveh@ci.yelm.wa.us> steveh@ci.yelm.wa.us
<DC90029353CCCD468AA2A2858FFCD8F528F765@server1.ci.yelm.wa.us>
Willow Glenn III is requesting a walk through of Development.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
We have been contacted to do a final construction inspection for the Willow Glenn III subdivision located between Green Leaf Road
We have been contacted to do a final construction inspection for the Willow Glenn III subdivision located between Green Leaf Road
Edward Smith
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Smitty
smitty@ci.yelm.wa.us
smitty
Public Works
Edward Smith
Edward Smith
smitty
Jon Yanasak
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Jony
jony@ci.yelm.wa.us
jony
Public Works
Jon Yanasak
Jon Yanasak
JONY
Nisha Box
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Nishar
nishab@ci.yelm.wa.us
nishab
458-8430
Community Development
Nisha Box
Nisha Box
NISHAR
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
Tami Merriman
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tami
tamim@ci.yelm.wa.us
tamim
458-8496
Community Development
Tami Merriman
Tami Merriman
tami
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
Public Works
Tim Peterson
Tim Peterson
tim
Gary Carlson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gary
garyc@ci.yelm.wa.us
gary
Community Development
Gary Carlson
Gary Carlson
gary
We have been contacted to do a final construction inspection for the Willow Glenn III subdivision located between Green Leaf Road.doc
We have been contacted to do a final construction inspection for the Willow Glenn III subdivision located between Green Leaf Loop S.E. / Grove Road. This will be the final construction
inspection before the subdivision can be approved by City Council. I would like to request the following information be directed to Steve Harrington and copy to Jim Gibson on the email.
Steve will be collecting the different punchlist and forwarding one complete list to the developer. The following is a list of the needed inspections:
Public Works:
Sewer Department - sewer system
Water Department - water system, cross control
Street Department - sidewalks and anything else they might notice
Community Development Department
Landscaping – Nisha, the developer has requested that the hydroseed be done after all inspections of the irrigation system so it does not wash out any hydroseed.
All remaining items - Steve
We would like to respond to the developer with a list by June 6, 2007. Could you please give your list to Steve by June 5, 2007 so he can compile them and send it out on the June 6th,
2007. Thank you for your help. We are trying to make sure no other items are missed during project closeout.
Steve Harrington
City of Yelm, Engineering Civil Inspector
PO Box 479 Yelm,WA. 98597
Ph. 360.458.8423 Fx. 360.458.3144
steveh@ci.yelm.wa.us
.doc
WEHAVE~1.DOC
We have been contacted to do a final construction inspection for the Willow Glenn III subdivision located between Green Leaf Road.doc