05-0345 water dept commemts 0509061. At lot four and five, there is a Fire Hydrant and two sewer boxes. Is there ten feet between theses?
2. Are the storm ponds going to have a irrigation system and double check valve assembly on this part of the project?
3. On sheet 17: Water note five reads xxlf eight inch PVC C900 water main.
4. The blow off assembles need to be in the planter strips.
5. The water for lot 23 and sewer for lot 24 must have a minimum of ten feet separation.
6. Air/vacuum will be piped out the side or back of the box.
7. Sheet 19: Why does the water main have five feet of cover? NO
8. Lots 54 and 55 how are they going to get water?
9. This set of prints does not show the entire project.
10. The end of the water main will end with the same size gate valve and a blow off. This main will be extended in the future.
11. The temporary water service to the office trailer must be removed back to project property line before final.
12. The main on Grove Road shall be connected to the existing main at 100th Way Ct. Tim will not have a late comers agreement on Grove Road, unless this main is connected to 100th Way
Ct, existing eight inch main.
13. Public Works would like to see a copy of this prints before they are signed. PER TIM