Loading...
05-0345 Sewer No. 1 051507 CITY OF YELM SEWER DEPARTMENT Re: Willow Glen III Final Plat Inspection Punch List May 15, 2007 All “End of Line Clean-Outs” must have the blow-off pipe extended as high as possible with Hex-Head caps secured loosely with valve box lids that are embossed with the word “SEWER”