05-0345 Sewer No. 1 051507
CITY OF YELM SEWER DEPARTMENT
Re: Willow Glen III Final Plat Inspection Punch List
May 15, 2007
All “End of Line Clean-Outs” must have the blow-off pipe extended as high as possible with Hex-Head caps secured loosely with valve box lids that are embossed with the word “SEWER”