Loading...
05-0345 Water Final No 2 070307 From: Edward Smith Sent: Tuesday, July 03, 2007 9:58 AM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Willow Glen 3 Second Walk Finals # 2 Public Works Report.doc Willow Glen 3 Second walk throught for water. ????????r City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date: #/July/2007                                                       Page  1    of   1     Location: Willow Glen 3                                           Department:  Water   Contractor:  YPD                                                         Rep: Walter   1.         The developer is responsible for the cost of the fire hydrants locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. Has this been paid? 2.         Has the temporary water service from the well to the job/office been discontinued from the source? 3.         Need to raise the meter setters for lot 42 and 43.             Inspected by:  John I and Tim Signed by:    Edward Smith