Loading...
05-0345 Water Final no 1 053007 From: Edward Smith Sent: Wednesday, May 30, 2007 2:32 PM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Williow Glen 3, First Walk Final, Public Works.doc Final inspection walk through for water #1 ???l City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date:   30 May 2007                                                                          Page  1    of   1     Location:  Willow Glen 3                                                                   Department:  Water   Contractor:   YPD                                                                               Rep:Walter 1.         The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2.         Move the meter box back and straighten out setters for lots 40 and 41. 3.         Need too raise meter box for lots 42 and 43. 4.         Need to clean out the irrigation meter setter at the end of Green Leaf Ct. 5.         Need to lower the meter setters for lots 54 and 55. 6.         Need to discontinue temporary water service from the well to the job/office, and disconnect it from the source.     Reviewed by: John I and Edward Smith Signed by:    Edward Smith