Loading...
City of Yelm Inspection Form 12 Drainage Facility City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/30/06 Day: Monday Time: 3:15 p.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Partly cloudy, warm, overcast. Soil conditions are rocky, dry and dusty  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on storm drainage storm facility at end of Fir Ct. Added washed rock and backfill.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material)  5. Sketch or Paste Pictures Below:    Date 10/30/06 Typed or Printed Name and Title Steve Harrington Signature