Loading...
City of Yelm Inspection Form 15 Curbing City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 12/15/06 Day: Thursday Time: 11:45 a.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cloudy, Heavy Rain. Soil conditions are rocky, wet  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor placing curbing and gutter.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Wet soils and heavy rains  5. Sketch or Paste Pictures Below:    Date 12/15/06 Typed or Printed Name and Title Steve Harrington Signature