Loading...
City of Yelm Inspection Form 17 Dry utility ditch & Top Rock City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 1/5/07 Day: Friday Time: 1:15 p.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cloudy, Heavy Rain. Soil conditions are rocky, wet  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on dry utility ditches.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on dry utility ditches.  Sketch or Paste Pictures Below:    Date 1/5/07 Typed or Printed Name and Title Steve Harrington Signature