City of Yelm Inspection Form 18 Bio swale block wall and grade
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 1/29/07
Day: Friday
Time: 1:15 p.m.
Project Name:
Willow Glenn III
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Yelm Property Development
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on Bioswales finishing block walls and grading.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on bioswales.
Sketch or Paste Pictures Below:
Date
1/29/07
Typed or Printed Name and Title
Steve Harrington
Signature