City of Yelm Inspection Form 20 Top Course and Paving City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/20/07 Day: Thursday Time: 8:30 a.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development / LakeRidge Paving  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on Bioswales laying saude.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on Prep for frontage and paving.  Sketch or Paste Pictures Below:    Date 4/20/07 Typed or Printed Name and Title Steve Harrington Signature