City of Yelm Inspection Form 21 Cleaning Storm System and replacing broken sidewalk
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 5/8/07
Day: Tuesday
Time: 8:35 a.m.
Project Name:
Willow Glenn III
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Yelm Property Development / Pro Vac
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on Bioswales Jetting and Cleaning Stormlines and C.B.’s.
Fixxing broken sidewalk, pouring concrete.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on cleaning storm system and replacing broken sidewalk.
Sketch or Paste Pictures Below:
Date
5/8/07
Typed or Printed Name and Title
Steve Harrington
Signature