Loading...
City of Yelm Inspection Form 21 Cleaning Storm System and replacing broken sidewalk City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 5/8/07 Day: Tuesday Time: 8:35 a.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development / Pro Vac  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on Bioswales Jetting and Cleaning Stormlines and C.B.’s. Fixxing broken sidewalk, pouring concrete.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on cleaning storm system and replacing broken sidewalk.  Sketch or Paste Pictures Below:    Date 5/8/07 Typed or Printed Name and Title Steve Harrington Signature