City of Yelm Inspection Form 3
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 8/28/07
Day: Tuesday
Time: 4:00 p.m.
Project Name:
Willow Glenn III
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Yelm Property Development
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Hot, clear. Soil conditions are rocky, dry and dusty
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor
has 2- Hitachi excavators and 1- case backho working on cutting in Green Leaf Way S.E. approximately 700’ of excavation for roadway layout. Contractor is excavating in very dry and
rocky soils. Call from Loren Wade, contractor is shutting down for the day around 11:00 a.m. due to wind causing a lot of dust.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) No test on native material at this time
5. Sketch or Paste Pictures Below:
Date
8/28/06
Typed or Printed Name and Title
Steve Harrington