City of Yelm Inspection Form 4 City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 8/28/07 Day: Wednesday Time: 4:00 p.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Hot, clear. Soil conditions are rocky, dry and dusty  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor has 2- Hitachi excavators and 1- case backho working on cutting in Green Leaf Way S.E. approximately 700’ of excavation for roadway layout. Contractor is excavating in very dry and rocky soils. Call from Loren Wade, contractor is shutting down for the day around 11:00 a.m. due to wind causing a lot of dust.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) No test on native material at this time  5. Sketch or Paste Pictures Below:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Date 8/28/06 Typed or Printed Name and Title Steve Harrington Signature