City of Yelm Inspection Form 6 Drainage City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/09/06 Day: Monday Time: 10:00 a.m.  Project Name: Willow Glenn III Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: Yelm Property Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Partly cloudy, warm, overcast. Soil conditions are rocky, dry and dusty  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is doing digouts for storm drainage containment between lots 11, 14, and between Birch Ct. Oak Ct.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Exxing out for storm drainage system.  5. Sketch or Paste Pictures Below:    Date 10/09/06 Typed or Printed Name and Title Steve Harrington Signature