City of Yelm Inspection Form 7 Drainage
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/03/06
Day: Tuesday
Time: 4:00 p.m.
Project Name:
Willow Glenn III
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Yelm Property Development
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Partly cloudy, warm, overcast. Soil conditions are rocky, dry and dusty
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor
is setting Type 1 storm catch basins @ Sta.12+65.49, 18.50’LT & Sta.31+62.57, 11.75’RT & Sta. 31+62.57, 11.75’LT & Sta.15+61.76, 18.5’RT, Sta.15+61.89, 18.5’LT, Sta.17+96.48, 18.50’RT,
Sta.18+11.58, 18.5’RT Sta.18+11.58, 18.5’RT with 12” Ductile Iron storm line for road way crossing in traffic area. Install 12” ADS storm lines.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Sand bedding. Type 1 c.b.’s backfilled with pee gravel.
5. Sketch or Paste Pictures Below:
Date
10/03/06
Typed or Printed Name and Title
Steve Harrington
Signature