City of Yelm Inspection Form 8 Drainage - Gallery
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/19/06
Day: Wednesday
Time: 11:30 a.m.
Project Name:
Willow Glenn III
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
Yelm Property Development
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Partly cloudy, warm, overcast. Soil conditions are rocky, dry and dusty
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor
has set 12” Perferated ADS storm lines in bioswales, underdrains and rock galleries. All drainage pipes and galleries are covered with washed drain rock and filter fabric per plans.
Storm water facilities are are placed at the following locations. Oak Ct. & Birch Ct. and in between lots # 11, 13 and 14 and at the end of Fir Ct. and in between lot # 28 and Grove
Rd.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Approved 12’ ADS Perf Pipe, Washed Rock and Filter Fabric.
5. Sketch or Paste Pictures Below:
Date
10/19/06
Typed or Printed Name and Title
Steve Harrington
Signature