Loading...
TIA 10-05-05Traffic Impact Analysis Willow Glenn Phase III Preliminary Plat Prepared For: Yelm Property Development LL.C. 16422 SE Middle Street Yelm WA 98597 Prepared By: Skillings-Connolly, Inc. 5016 Lacey Boulevard SE Lacey, Washington 98503 (206)491-3399 October 2005 1 1 1 Traffic Impact Analysis Willow Glenn Phase III Preliminary Plat Prepared For: Yelm Property Development LL.C. 16422 SE Middle Street Yelm WA 98597 Prepared By: Skillings-Connolly, Inc. 5016 Lacey Boulevard SE Lacey, Washington 90503 (206) 491-3399 October 2005 i~ INTRODUCTION This report documents the traffic impact analysis performed for the proposed Willow Glenn Phase III preliminary plat on the west side of Grove Road in Yelm, Washington. Access from the subdivision will be by way of Grove Road SE and via Greenleaf Loop &Cascadian /Sundance Avenues SE with their intersections with Middle Road (Figure 1). The access on Grove Road SE is to be stop sign controlled. The site plan (Figure 2) shows the proposed layout and the access roadways. The roadways within the subdivision will be public roadways. This report addresses the existing traffic conditions in the area and provides analysis and discussion of the traffic impacts that will be created by the Willow Glenn Phase III plat. The proposed development will be composed of 51 single-family dwelling units when completed in 2007. EXISTING CONDITIONS Road Network Grove Road SE is a 22-foot wide surfaced two-lane neighborhood collector with no shoulders, which provides the eastern access to and from the development, and the residential area to the north connecting with Canal Road SE. Greenleaf Loop, Cascadian and Sundance Avenues SE are two-lane paved local access residential streets that connects Greenleaf Way SE with Middle Road SE Middle Road is a 22-foot wide two-lane paved local access residential street with no shoulders between Railway Road and 100'" Way SE, except for curb and sidewalk improvements along the frontage of the Willow Glenn Phase II and Oakridge developments. 100`" Way SE is a 22-foot wide two-lane paved local access residential street with no shoulders that connects Middle Road with Grove Street. It is an extension of Middle Road. Railway Road is a 22-foot wide surfaced two-lane collector with no shoulders that connects 1~' Street north with Wilkensen /Canal Roads and provides the western access to and from Middle Road and the residential areas to the north to the Yelm city center. Yelm Avenue (Washington State Routes 507/510) is a two-lane east-west arterial. The speed limit along Yelm Avenue is posted at 30 MPH. The intersection of Yelm Avenue and 1"Street is signalized. 1" Street is a two-lane north-south arterial. 1" Street south of the signalized intersection with Yelm Avenue is Washington State Route 507. 1s` Street to the north connects with Railway Road and Rhoton Road and provides access to northerly residential areas. I' w C7 0 '~ F` ' << y ' C ~ nod;) ~; j ~ ?~ ~ w .a' ~ ~` a ~ ` ~ ~ ~ a d ' ~; ~O ~ J ~ _ U Z s ~ (n `~ ~ ~ H a ~ ri~~io;~a ~ Z ~ ~ ~ Vo z , a w v> W ~ ~~ - ~ ` ~ 0 ~ o ~ j w" ~n =OmLL J = ~~ ~ ~ E'o Y v l V m m ~~ J- amrsiw~ as on <n sn m •o n umu imcnn wn ~ _ -~_ v - rv 3S Ot1 3A0!('J "" i ~~ ~ ~---~- o _,o s :s~ssss~~. ~~ ///~ ~ ~~ ~%i I, a ~` ~° _ ~- ~~ .I_ ' _ ~ _> ~~ ., ~~ ~ x '~~ ~- ~~ } .. ~ ~ '_ ~~~ ~ ~ ~ ~ ~.' ~ r ~~ ,ri ~ ~~ ~ IY_` I 1,.. ~_ _rl ~ m -~ ~ R - T a~ I fT ~_ ~, ~ , 1 ~ ~ T{ t r .I d I~{. ry~ ~ _f~ `" a ~ - I5 I I ~ ! ~~I ,~ p I~ }- ~ rl I - ~~ ~ ~~ ~, I~ ~ I .. ~~ ,,. ~ I~ . ~~~~ _.. ;, 'L ~~_ ~~, .:~,-1~, ~. ~ -- ~,~~ e -~ a~az= .~v -.~--f -..- - -1- _ ._,_ - --- ~oohoo,~ , ~5r~~~e „ ,o ~ ~ i : , ,.. ~_.~si' t,~ e _ ~ ~RO~ , ~ / Q -~ ~'v $ } N / ~~ z~ ~ ~ r__~ ~ ~~ ~~ - wT ~_ ~~ i= -~ , t- ~+ a ~4 4 a ~ v a .~- mf -1 a J N ~ W } ~~ ~a c~ ~_ J W d z z W ~,9 J ~ W 3 `" oa J ~~m =~aLL Z „~ N V e ~~ r a o . L ° '' I , o ~ J U n c ~ ? n . j V ~ ~. o 0 ° ~I ~ m z i~ Traffic Volumes The selection of the study intersections is based on the City of Yelm's approval of the July 12, 2005 scoping proposal. They are: • Yelm Avenue & 1~' Street (signalized intersection) • Railway Road & 1 ~' Street (two way stop control) • Middle Road & Railway Road (two way stop control) • Grove Road -Flume Roads & Canal Road (two way stop control) The PM peak hour turning movement counts were performed at the Middle Road & Railway Road and the Grove-Flume Roads& Canal Road intersections during the last week of August 2005. Turning Movement counts for 1~' Street & Yelm Avenue and ts` Street and Railway Road were taken from the March 2005 Yelm Retail Center Traffic Impact Analysis and projected to 2007 base year. The existing 2005 PM peak hour traffic volumes in the project area are shown on page 4. Accident Review Accident data was obtained from the Washington state department of Transportation for the past three years (January 1, 2002 to December 31, 2004). Number of Intersection Accidents Intersection 2002 2003 2004 1 s` St & Yelm Ave. 11 11 9 1~'St. /Rhoton Rd & 0 1 0 Railway Road Railway Rd & 0 0 0 i Middle Rd. Canal Rd & Grove - 0 0 0 Flume Rd The Yelm Ave. and 1 ~` St. intersection was the only intersection analyzed for accident rate. Utilizing the average annual daily traffic entering the intersection, the calculated accident rate for this intersection in 2002 is 1.38 per million vehicles entering (MEV), 2003 is 1.37 MEV, 2004 is 1.03 MEV. Construction of the Yelm Loop projects should reduce the number of accidents at this intersection. The low number of accidents at the other intersection did not warrant analysis Sight Distance Review A sight distance review was conducted at the proposed development access point at Grove Rd. Sight distance to the right is approximately 600 feet. To the left, [he distance is approximately 600 feet also. These distances are more than adequate for the 35 MPH speed limit. I , School Pedestrian Routes There are no existing pedestrian facilities on Grove Road. The Yelm School district was again contacted for a walking plan for the school. The Yelm District still does not allow students to walk or ride bicycles along Middle Road or 100'" Way to the school and provides bus service for these students. Existing Levels of Service All level of service (LOS) analyses were conducted following the procedures outlined in the 2000 Highway Capacity Manual and utilized Highway Capacity Software. The LOS at unsignalized stop sign controlled intersections is measured in terms of approach delay. The LOS at signalized intersections is measured in terms of control delay. The reported LOS is typically for the worst case of all the calculated movements. Geometric characteristics and conflicting traffic movements are taken into consideration when determining LOS. Existing PM Peak Intersection Delay LOS Middle Rd & Railway Rd 9.4 A Grove -Flume Rd & Canal Rd 12 0 B 1a' St. & Railway Rd 11.3 B Yelm Ave & 1 s' St. 29.9 C I ' 10~ ~ ~ 57 119 '`2 528 ~~ ~ ~ 419 sz t r,76 11~ 96 ~4 1st St S Yelm Ave. 156-'n 1 L9 t ~-r, 176 ~ 92 1st St 8< Railway Rd J 15~~~ 106 i~ 135 Grove ~ o l~ L° 14 r1 14 Rd & Canal Rd 2s 1 L~ ,~. r4o 38 Railway Rd & Middle Rd Existing 2005 PM Peak Hour Tragic Volumes I ' 4 TRAFFIC IMPACT ANALYSIS Trip Generation The trip generation values for the 51-lot plat are based on the maximum number of dwelling units proposed. The average rates for single-family detached housing (code 210) from the Institute of Transportation Engineers' Trip Generation (7th Edition, 2003) were used to calculate the number of trips generated. The following table reflects the average weekday daily traffic volume (AWDT) and weekday PM peak hour volumes. Trip Generation Summary PM Peak hour volumes Average kd D il W 51 units Entering Exiting ee ay a y Traffic Volume PM PM Greenleaf via Mitldle Road 23 10 307 Grove Road 10 9 181 Total 33 19 488 Trip Distribution Trip distribution to and from the proposed development was based on area traffic flow percentages provided by the city of Yelm. Figure 3 depicts the predicted project-generated PM peak hour volumes assigned to the surrounding street network. Proiected Traffic Volumes The estimated non-site (base line) traffic volumes, expected at project completion (2007), were projected forward from 2005 traffc counts projected to 2007 using annual growth rates provided by the city. These rates are 2% for all intersections. The City reported "pipeline" developments that might have an effect the traffic impacts. The proposed trips generated by the Oakridge development were included in the forecast traffc volumes. The forecast traffic volumes both without and with site traffc are shown on pages 6 & 7. Future Levels of Service Weekday PM peak hour LOS analyses were conducted for the study intersections using the projected 2007 turning movement volumes both with and without the proposed project. These analyses were conducted following the procedures outlined in the 2000 Highway Capacity Manual. Highway Capacity Software and Sincro software were used for analysis. The table on page 8 summarizes the results. I ' ~^ W F Od W .. 3~02i~ W N Z a of U w /., } ! a s 0 0 a vd~ 0 Q J z w w Q ~o 0 z ~, a 0 ~~`~F. \ a ~`O - ~ i ~~ ~~ ~s ~, z o Y ch m W ~~ ° n ~ _ y o ~ ~ a _ LLc Q 3 w d F- N ~ ~i ~C O N V C1 ~, i ,J L~ 54s ~- ~] ~ 436 sz t ~-r,~ 11~ 101 '"3 1st St. ~ Yelm Ave. 1s2 1 Lo t ~-r2 183 ` 112 1st St 8 Railway Rd i ~- J L° 16 y ~ ~ 15 110 ~ ~1 14~ 15 Grove Rd 8~ Canal Rd is 1 Ls t r5, 40 "3 Railway Rd ~ Middle Rd 2001 PM Peak HourTraffic Volumes Vlr~houtSite I ' 6 i~ „~ 1 1J L~ 54s~y ~] ~ a3s 69 i ~ i 183 11~ 104 ~33 1st St. ~ Yelm Ave. 162_" 1 yLo t r~ 183 ~~ 1st St & Railway Rd «~ ~J 16 !~>•~ 112 i 14~ Grove ~~ 1 ~15 t r, 15 Rd & Canal Rd 2s ~ 4 1 L8 t ~r2 40 '" Railway Rd & Middle Rd 2001 PM Peak Hour Traffic Volumes With Site 2007 Peak Hour LOS I ti Without Site Traffic With Site Traffic ntersec on Dela LOS Dela LOS Middle Rd & Railway Rd 9.5 A 9.7 A Grove -Flume Rd & Canal Rd 12.2 B 12.2 BA 1 ~' St & Railway Rd 11.6 B 11.9 B Yelm Ave & 1 ~` St 30.4 C 33.1 C The Middle Rd & Railway Rd intersection currently operates at LOS A during the PM peak hour. By 2007, the intersection will operate at LOS A during the PM peak hour. When the predicted traffic from the proposed subdivision is added, it will continue operating at LOS A with a slight increase in delay time. The Grove -Flume & Canal Rd intersection currently operates at LOS B during the PM peak hour. By 2007, the intersection will operate at LOS 8 during the PM peak hour. When the predicted traffic from the proposed subdivision is added, it will continue operating at LOS B with a slight increase in delay time. . The 1~` St & Railway Rd intersection currently operates at LOS B during the PM peak hour. By 2007, the intersection will operate at LOS B during the PM peak hour. When the predicted traffic from the proposed subdivision is added, it will continue operating at LOS B with a slight increase in delay time. . The Yelm Ave & 1~` St intersection currently operates at LOS C during the PM peak hour. By 2007, the intersection will operate at LOS C during the PM peak hour. When the predicted traffic from the proposed subdivision is added, it will continue operating at LOS C with a Slight increase in delay time. Construction of the Yelm Loop projects should reduce the congestion and increase the level of service at this intersection. MITIGATION No significant impacts were discovered during this analysis that require mitigation. I ' SUMMARY Traffic counts taken in January and September 2005 established the 2005 base traffic volumes used for this analysis. The existing traffc was projected forvvard to 2007, which is the projected build out year for the development, using a growth rate of 2% for all intersections. The trips generated by the Oakridge Development were included in the forecast traffic volumes. The generated trips from Willow Glenn Phase III preliminary plat were then added to achieve the traffic volumes expected when the development is completed. The proposed Willow Glenn Phase III preliminary plat will generate a total of 51 vehicle trips (33 inbound and 19 outbound) during the weekday PM peak hour. These trips were distributed to the entrances on Grove Rd and Middle Rd via Greenleaf St. These trips were then distributed based on the existing traffc flow patterns provided by the City. Approximately 45 percent of the trips were distributed northwest toward Lacey and Interstate 5, 39 percent easterly toward McKenna, 10 percent toward Rainier, and 6 percent toward Nisqually Pines. The results of this traffic impact analysis show that traffic from the proposed Willow Glenn Phase III preliminary plat will not significantly decrease the levels of service at the intersections in the surrounding street network. Delay time at the LOS C intersection at Yelm Avenue and 15' Street is not significantly increased. The addition of traffic from the plat will not significantly increase the current accident rate of 1.03 per MVE at the Yelm Avenue & 1~' Street Intersection. There are no other intersections in the scope of this study with a signifcant accident history. Sight distance at the intersections is adequate. The intersection alignment a[ Middle Road and Railway Road is adequate for the existing traffic and should not be a future problem with the addition of traffic from the Oakridge project. It appears that there will be no sight distance problem at the Grove Street entrance to the development Concern for school children walking along Middle Road to Fort Steven Elementary School is a non-issue since [he School District does not allow students to walk or ride bicycles to school along Middle Road. I , Appendix I' io Skillings -Connolly, Inc. 5016 Lacey blvd Lacey, WA 98503 File Name :railway & middle Site Code :00000000 Start Date :9/28/2005 Page No : 1 -- _ _ Groups Printetl - Unshiftetl - _ Ra So Jway uNbo Rtl und Midtlle Rtl Weslbountl Railway Rd No rthbountl MID Eastbountl Start - Thr Pog Petl r App _ Thr _ Po9 Petl App Thr' _ Rlg Ped _ App Thr. Rig Petl APP Int. Tlme Left u i ht s TOtal Left u ht s Total Left u hl s Left Total u ~~ I ht s Total Total Factor _ 10 1.0 10 _ 0 10~ 1.0 _ 10~1D~ 10 _ 1.0 10 10 _ _ 10 1.0! 1.0 10 t 04:00 PM 1 10 0 0 ii ii 0 0 0 11 0 10 9 0 19 ' 0 0 0 0 0. 41 04:15 PM 1 3 0 0 4 9 0 2 0 11 0 8 11 0 19'. 0 0 ~ 0 0 0' 34 04:30 PM 1 5 0 0 6 9 0 3 0 12 ~, 0 13 13 0 26 ' 0 0 0 0 0' 44 04 :4 5 PM 0 9 0 0 9 12 0 3 0 15' 0 4 7 0 71 0 0 - 0 0 0 - 35 _ _ Total 3 2] 0 0 30 41 0 8 0 49 0 35 60 0 75 0 0 0 0 0 154 05'00 PM 2 6 0 0 8. 5 0 0 0 5 0 10 11 0 21 0 0 0 0 0 34 05'15 PM 0 8 0 0 8 14 0 1 0 15 0 11 10 0 21 I, 0 0 0 0 0 44 05:30 PM 2 8 0 0 10 11 0 1 0 12 0 8 13 0 21 0 0 0 0 0' 43 t 05:45 PM 3 5 0 0 8~i 5 0 -- 1 0 6 0 5 11 0 i6'. 0 0 - 0 0 0. - 30 Total ] -2] 0 0 34 35 0 3 0 38 0 34 45 0 79 0 0 0 0 0 151 Grantl Total 10 54 0 0 fi4~ 7fi 0 11 0 8] 0 69 85 0 154 0 0 0 0 0 305 Apprch % 15. 84 4 0.0 0.0 87 4 0.0 12 fi 0.0 ~ 0.0 64. 55 2 0.0 0.0 0.0 0.0 0.0 6 8 Total % 3.3 1 ~ 0.0 0.0 21.0 2 9 0.0 3.6 0.0 28.5 0.0 2 6 2 B 0.0 50.5 0.0 0.0 0.0 0.0 0.0 RaT By Ad ON In Total 60~ 6C 14J 0 SC 10 0 R19M1~ TM1,u LeR Petls I 0o O ° NoM - y N c o - 9l2&20056:0000 PM - _ 9/3&2005 5:65:00 PM ~:¢ ~ - o UnsM1iRM O _ _. _. ` . , L_eR TM1m Right PeOs 0 69 65 0 130. i5C ]OA, - ON N Tobl i, Skillings -Connolly, Inc. ' 5016 Lacey blvd Lacey, WA 98503 File Name :railway & middle Site Code :00000000 ' Start Date :9/28/2005 Page No : 2 ~~ d R R ' M ' Sou h untl w s G _ Nort tl Ea unC Start _ 9 Thr Ri Petl Lefl _P A p eft Thr 9 Ri Petl PP A Thr Ri Petl 9 Lett A Thrl PP Lett 9 Ri Petl A PP ' Int Tlme u ht s Total a ht s _ „ Total u ht s Total u h[~ _ s ~ Total Total Peak HOUr From 04:00 PM to 05:45 PM-Peaks o fi Intersects 0430 PM an Volume 3 28 0 0 31 !, 40 0 ] 0 471, 0 38 41 0 ]91 0 0 0 0 0'~. 157 Percent 9] 9Q 0 0 0.0 8 ~ 0.0 1 9 0.0 0.0 48 519 0.0 0.0 0.0 0.0 0.0 ' . 05:15 0 8 0 0 8' 14 0 1 0 15 0 11 10 0 21 0 0 0 0 0 44 Volume Peak 0.892 ' Factor High Int. 0465 PM 04:45 PM 04:30 PM 3:45:00 PM Volume 0 9 0 0 9 12 0 3 0 15 0 13 13 0 261 Peak 0.86 0]8 0]6 ' Faclor 1 3 0 ' way o~rz m rain ' I OS' 31' ]6 0 10 3 0 RigM1t TM1m Leh Petls 1 ' oo _ O NatM1 9/28IP005 P.30:00 PM W28I2005 5.1S0n PM 1 , ' 2PI, J ~n - . -' - UnsNXM - ' Oo Q o m6 d • t Leh Tlvu RIgM Petls 0 J6 61 0' ' 68 ]9 1Q QM1 In T01a1 1 Skillings -Connolly, Inc 5016 Lacey blvd i~ Lacey, WA 98503 File Name :Grove-Flume & Canal Site Code :00000000 Start Date :9/29/2005 Page No : 1 _ GrouQ Printed - Uns hifted _ _ _ _ _ -- FL UME RD CANAL RD GROVE RD ~~, CANAL RD Southbo und Westbound Northbo und Eastbound Left g ~ PP A Left Th r ! RI Pe g' PP A Left ~ Thr Rig Ped APP Left Thr Rig Petl APP ~, _ Int- Time a L ht RI s 1e Total u ht s Total u ht s Total a ht s Total Total' Factor 1 0 O O ~ 0 - - __LO I - o O 0 I ~ _ 1,0 1.0 1.0 1.0 1 0 1 0 1.0 1 0 . - 04:00 PM _ 0 -$_ _ _-1 0 6 0 4 0 0 4 29 2 0 0 31 0 4 23 0 27 68 04:15 PM 0 2 3 0 5'I 1 2 i 0 4' 35 1 2 0 381 5 4 29 0 38 85 04:30 PM 0 0 2 0 2 0 1 0 0 1 32 3 0 0 35 I 2 4 24 0 30 68 04 :45 PM 0 3 4 _ 0 --- 7 ~ 0 3 0 0 3'~. 33 4 1 0 38' 2 2 23 0 27. ]5 - _ Total 0 - 10 10 0 20 ' 1 10 1 0 12 129 10 3 0 142 9 14 99 0 122' 296 05:00 PM 0 1 0 0 1 1 3 0 0 4 33 3 2 0 38 2 4 26 0 32 75 05:15 PM 0 3 1 0 4 0 ] 0 0 ] 37 4 1 0 42 1 5 33 0 39 92 05:30 PM 0 2 0 0 2 2 3 0 0 5 32 4 0 0 36 '. 1 2 i] 0 20 63 0545 PM 0 1 1 0 2 0 1 0 0 1 33 1 0 0 34. 0 6 20 0 26 63 Total -0 7 2 0 9 - _ 3 __ _ 14 0 0 fY 135 12 3 - _. 0 150' 4 17 96- 0 11] ~ 293 Grand 0 1] 12 0 29 4 24 1 0 29 264 22 6 0 292 13 31 195 0 239 589 Total Apprch % 0.0 58. 41 4 0.0 13. 82 8 34 0.0 90 4 ZS 2.1 0.0 5.4 13. 81 8 0.0 6 8 0 Total% 0.0 2.9 2.0 0.0 4.9' 0] 4.1 D.2 0.0 4.9 4B 3] 1.0 0.0 49.fi 2.2 5.3 3~' 0.0 40.6 _ _ _. FLUME RO _. -_ ON In io~al J6 29 fi5 12 A 0 0 Ri9M Ttru Len Pe05 ~ ~ 6bM - 1 ~ - - 9/29/20050:00 OO PM - _ 9/290005 5 <5:00 PM - -' ' - Unshinetl - a ^ $ _ __._ a .. _ P ~~, _ Len rnm Rigne PeEs _ 266 22 6' 0 216_ 292 500 ON In Total Skillings -Connolly, Inc 5016 Lacey blvd Lacey, WA 98503 File Name :Grove-Flume & Canal Site Code :00000000 Start Date :9/29/2005 Page No : 2 'i, FLUME RD CANAL RD GROVE RD CANAL RD '. Southbauntl W estbountl . Northbou _. ntl Eastbound - } _ _. ~; Start I, Thr RI Ped APF Thr RIg Ped ~ App. Thr' -: Rig Ped l1PP. Thr Rig Ped APP Int.' Tlme' Left u, ht s Total Lelt a Le8 ht s I Total _-_ __ u _ ht _ Left s Total u i ht s Total Tota_I Peak Hour From 04:00 PM to 05:45 PM - Peak i of 1 Intersecti 04:30 PM ' on Volume 0 7 7 0 14 ' 1 14 0 0 i5., 135 14 4 0 153 7 15 106 0 1281 310 Percent 50. 50. 0 0 0.0 6] 93 3 88 0.0 0.0 2 9.2 2.6 0.0 S.5 11. 82 6 0.0 . 0 0 ~ 7 05:15 0 3 1 0 4 0 7 0 0 7 37 4 1 0 42 1 5 33 0 39 92 Volume Peak '' 0.842 Factor High Int. 04:45 PM 'I 05:15 PM 05:15 PM 05:15 PM ' Volume 0 3 4 0 7 0 ] 0 0 7 37 4 1 0 42 1 5 33 0 39 Peak 0.50 0.53 0.91 0.82 Factor 0 ' 6 1 1 CN m rolal ~. zi. _ _1e' a5. K Y o 0 - Right Tlru LeX Petls • ~ v. r ~ n ~ ~ ~ -_. ~ O : - Nor1M1 yl ' ~ ~ ia - 9p912005 4:00:00 PM ' - ' _ 9pW10055]S:OO PM p -~O `1 ~ UnshlXeE - O 4 I ~ , Lefl TM1m RyM P[ds _ - _ 16s id a a' itd 150_ 269 ON In TNaI I , Yelm Ave. & 1st Street Baseline 3: Int s/2s/26os Lane Configurations ~ ? ~ ~ 'N ~ A ~ A Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.95 1.00 0.99 1.00 0.89 1.00 0.90 Fll Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prof) 1752 1845 1568 1736 1807 1752 1649 1770 1685 Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.39 1.00 0.25 1.00 Satd. Flow (perm) 1752 1845 1568 1736 1807 719 1649 466 1685 Volume (vph) 119 528 fib 176 419 32 111 93 224 57 58 101 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Fbw (vph) 125 556 69 185 441 34 117 98 236 80 61 106 Lane Group Flow (vph) 125 556 69 185 475 0 117 334 0 60 167 0 Heavy Vehicles (%) 3% 3% 3% 4% 4°h 4% 3% 3°h 3% 2% 2% 2°/ Parking (#/hr) 5 Tum Type Prot Perm Prot pm+pt pm+p[ Protected Phases 5 2 1 6 7 4 3 8 Permitted Phases 2 4 8 Actuated Green, G (s) 7.9 30.4 30.4 9.8 32.3 23.0 17.9 16.6 14.7 Effective Green, g (s) 7.9 30.4 30.4 9.8 32.3 23.0 17.9 16.6 14.7 Actuated g/C Ratio 0.10 0.40 0.40 0.13 0.42 0.30 0.24 0.22 0.19 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Grp Cap (vph) 182 738 627 224 768 287 388 134 326 v/s Ratio Prot 0.07 c0.30 c0.11 0.26 c0.03 c0.20 0.01 0.10 v/s Ratio Perm 0.04 0.10 0.09 vlc Ratio 0.69 0.75 0.11 0.83 0.62 0.41 0.86 0 45 0.51 Uniform Delay, d1 32.9 19.8 14.3 32.3 17.0 20.0 27.9 24.7 27.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 10.3 4.4 0.1 21.3 1.5 0.9 17.4 2.4 1.4 Delay (s) 43.1 24.0 14.4 53.6 18.5 21.0 45.3 27.1 28.8 Level of Service D C B D B C D C C Approach Delay (s) 26.3 28.4 39.0 28 4 Approach LOS C C D C HCM Average Control Delay 29.9 HCM Level of Service C HCM Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 76.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 75.8% ICU Level of Service C c Critical Lane Group Existing Condition Synchro 5 Report KDH Page 1 ' SKILLILACE-ST51 Yelm Ave & 1st Street 3: Int s/zs/zoo5 Lane Configurations ~ } ~ #( '(;. ~ j+ #t p Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.89 1.00 0.90 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prof) 1752 1845 1568 1736 1807 1752 1651 1770 1682 Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.39 1.00 0.25 1.00 Satd. Flow (perm) 1752 1845 1568 1736 1807 719 1651 466 1682 Volume (vph) 134 528 66 176 419 32 111 98 224 57 80 110 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 141 556 89 185 441 34 117 101 236 60 63 116 Lane Group Flow (vph) 141 556 69 185 475 0 117 337 0 60 179 0 Heavy Vehicles (°~) 3% 3% 3°~ 4% 4°k 4% 3% 3% 3°~ 2% 2% 2% Parking (#/hr) 5 Tum Type Prot Perm Prot pm+pt pm+pt Protected Phases 5 2 1 6 7 4 3 8 Permitted Phases 2 4 8 Actuated Green, G (s) 8.2 30.2 30.2 9.8 31.8 23.2 18.1 16.8 14.9 Effective Green, g (s) 8.2 30.2 30.2 9.8 31.8 23.2 18.1 16.8 14.9 Actuated g/C Ratio 0.11 0 40 0.40 0.13 0.42 0.31 0.24 0.22 0.20 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 189 733 823 224 756 289 393 138 330 v/s Ratio Prot 0.08 c0.30 c0.11 0.26 c0.03 c0.20 0.01 0.11 v/s Ratio Perm 0.04 0.10 0.09 v/c Ratio 0.75 0.76 0.11 0.83 0.63 0.40 0.86 0 44 0.54 Uniform Delay, di 32.9 19.8 14.4 32.3 17.4 19.9 27.7 24.6 27.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 14.8 4.5 0.1 21.3 1.6 0.9 16.6 2.3 1.8 Delay (s) 47.7 24.3 14.5 53.6 19.1 20.8 44.3 26.9 29.3 Level of Service D C B D B C D C C Approach Delay (s) 27.7 28.8 38.3 28.7 Approach LOS C C D C HCM Average Control Delay 30.4 HCM Level of Service C HCM Volume to Capacity ratio 0.80 Actuated Cycle Length (s) 76.0 Sum of lost time (s) 16.0 Intersection Capacity Uti lization 76.0 % ICU Level of Se rvice C c Critical Lane Group 2007 PM Peak w/o Project Synchro 5 Report KDH Page 1 SKILLILACE-ST51 Yelm Ave. & 1st Street Baseline 3: Int 9/29/2005 Lane Configurations ~ f ~ ~( fi '( f. ~ A Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.90 1.00 0.90 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prof) 1752 1845 1568 1736 1807 1752 1653 1770 1680 Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.39 1.00 0.25 1.00 Satd. Flow (perm) 1752 1845 1568 1736 1807 719 1653 466 1680 Volume (vph) 150 549 69 183 436 34 118 104 233 60 63 119 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Fk>w (vph) 158 578 73 193 459 36 122 109 245 63 66 125 Lane Group Flow (vph) 158 578 73 193 495 0 122 354 0 63 191 0 Heavy Vehicles (°k) 3% 3% 3% 4% 4°~ 4°h 3°,6 3% 3°,6 2% 2% 2°h Parking (#/hr) 5 Tum Type Prot Perm Prot pm+pt pm+pl Protected Phases 5 2 1 6 7 4 3 8 Permitted Phases 2 4 8 Actuated Green, G (s) 8.5 30.9 30.9 10.1 32.5 24.0 19.0 17.8 15.9 Effective Green, g (s) 8.5 30.9 30.9 10.1 32.5 24.0 19.0 17.8 15.9 Actuated g/C Ratio 0.11 0.40 0.40 0.13 0.42 0.31 0.24 0.23 0.20 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 191 732 622 225 754 268 403 138 343 v/s Ratio Prot 0.09 c0.31 c0.11 0.27 c0.03 c0.21 0.01 0.11 vls Ratio Perm 0.05 0.10 0.09 v/c Ratio 0.83 0.79 0.12 0.86 0.66 0.42 0.88 0.46 0.56 Uniform Delay, dt 34.0 20.6 14.9 33.2 18.2 20.3 28.3 25.3 27.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 24.4 5.7 0.1 28.1 2.1 1.0 19.0 2.4 2.0 Delay (s) 58.4 26.3 15.0 59.3 20.3 21.4 47.3 27.7 29.8 Level of Servce E C B E C C D C C Approach Delay (s) 31.6 31.2 40.7 29.3 Approach LOS C C D C HCM Average Control Delay 33.1 HCM Level of Service C HCM Volume to Capacity ratio 0.83 Actuated Cycle Length (s) 77.9 Sum of lost lime (s) 16.0 Intersection Capacity Utilization 78.8 % ICU Level of Service C c Cddcal Lane Group ^ 2007 PM Peak w/project Synchro 5 Report KDH Page 1 SKILLILACE-ST51 Two-Way Stop Control Page 1 of l TWO-WAY STOP CONTROL SUMMARY I nal st s Intersection ailwa Rd &lst St. enc /Co. Skillin s-COnnOll ,Inc. urisdiction Cd of Yelm Date Performed 9/29/2005 nal sis Year 2005 Existin nal sis Time Period PM eak hour Pro ect ID Willow Glenn 111 I, file://C:\Documents°/20and%20Settiugs\fred2\Local%20Settings\Temp\u2k4E.tmp 9/30/2005 HCSl000TM C°OY~igM1~ ~ 2000 Cniversiyof Florida, All RIgM1~s kcscrvcd Version iJ Two-Way Stop Control Page 1 of t TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal s[ s Intersection ailwa Rd &lst St. enc /Co. Skillin s - Connoll ,Inc. urisdiction Cit o/Yelm Date Performed /29/2005 nal sis Year 2007 Without Site nal sis Time Period PM eak hour Pro ect ID Willow Glenn Ill file://C:~Documents%20and°/20Settings~fred2~Local%20Settings\TempAu2k54.tmp 9/30/2005 k(('SOOOTM CoOWigM ®2000 Univeesi~y of Glnnda All RigM1~s Reserved Versmn 6.1 1 1 1 Two-Way Stop Control Page 1 of t TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal st fs Intersection Railwa Rd 81st St. enc /CO. Skillin s - Connoll ,Inc. urisdic[ion Cit of Yelm Date Performed 9/29/2005 nal sis Year 2007 With SiteTraffic nal sis Time Period M eak hour Pro'ect ID Willow Glenn 111 East/West Street: Railwa Rd North/South Street: 1st Street Intersection Orientation: North-South tad Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 183 130 11 162 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 203 144 12 180 0 Percent Heavy Vehicles 0 - - 0 - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Confguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 83 0 f0 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 92 0 11 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 onfguration LTR Dela Queue Len th, and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR (vph) 12 103 (m)(vph) 1223 627 Ic 0.01 0.16 5 % queue length 0.03 0.58 ontrol Delay 8.0 11.9 LOS A B pproach Delay -- -- 11.9 proach LOS -- -- 8 HCS'OOOTM Copyright S 20W llniversiey of Florida, All Righ¢ Reserved version 4 1 file://C:\Documents%20and%20Settings\(red2\Local%20Settings\Temp\u2k51.tmp 9/30/2005 Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information ite Information nal s[ s Intersection ailwa Rd 8 Middle Rd enc /Co. Skillin s-Connoll ,Inc. urisdiction Cd of Yelm Date Performed 9/30/2005 al sis Vear 2005 Existin nal sis Time Period M eak hour Pro ect ID Willow Glenn 111 East/West Street: Middle Rd NorthlSouth Street: Railwa Rd Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 38 41 3 28 0 Peak-Hour Faclor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 42 45 3 31 0 Percent Heavy Vehicles 0 - -- 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 40 0 7 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 44 0 7 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela ,Queue Len th and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Confguration LT LR (vph) 3 51 (m)(vph) 1522 873 /c 0.00 0.06 5%queue length 0.01 0.19 Control Delay 7.4 9.4 LOS A A pproach Delay -- -- 9.4 pproach LOS -- -- A gC9000TM ('opyrigh~3 2081 Oniversiry or Florida All Righ¢ Rcsaved Version 4. ~ file://C:\Documents%20aud%20Settiugs\fred2\Local%20Settings\Temp\u2k57.tmp 9/30/2005 Two-Way Stop Control Page 1 of 1 nal s[ s Intersection Railwa Rd & Middle Rd enc /Co. Skillin s-Connoll ,Inc. urisdiction Cit of Yelm Date Performed 9/30/2005 nal sis Year 2007 without site traffic nal sis Time Period M eak hour Pro ec[ ID Willow Glenn III R 0 0 10 ~ 11 ~ 12 ~ HCS?OOOTM CoOYrigh~`s~2UW C°Iversiry ol'FI°dika.All Rl~u Reserved Version dl ' file://C:\Documents%20and%20Settings\fred2\Local%20Settings\Temp\u2k5A.tmp 9/30/2005 Two-Way Stop Convol Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY r neml Infnrm~finn Site Information i~ nal st s Intersection Railwa Rd 8 Middle Rd enc /CO. Skillin s-Connoll ,Inc. urisdiction CR of Yelm Date Performed /30/2005 nal sis Year 2007 with site traffic nal sis Time Period PM eak hour Pro'ec[ ID Willow Glenn III file://C:\Documents%20and°/20Settings\fred2\Local%20Settings\Temp\u2k5D.tmp 9/30/2005 HC52000rrv~ CopyrigM1l uJ 20fp Universi[y of Floritla, All RlyJrls Reservetl Version 0.1 Two-Way Stop Control Page 1 oft I TWO-WAY STOP CONTROL SUMMARY I i~ Fl Rd 8 C G l nal st /s rove- ume ana Intersection Rd enc /Co. Skillin s-Connoll ,Inc. urisdiction Cit o/Yelm Date Performed 9/30/2005 nal sis Year 2005 Existin nal sis Time Period PM Peak Hour pro ect ID Willow Glenn 111 file://C:\Documenis%20and°/20Settings\fred2\Local%20Settings\Temp\u2k49.tmp 9/30/2005 CopyrigM1i ~ 2000 Gnivcrsiry of [londu All Rights Reserve) Verslan J I Two-way Stop Control Page I oF2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal s[ fs Intersection Grove-Flume Rd & Canal /C Skilli C ll I d enc o. D P rf rm t d n s- 9/30/2005 onno , nc. urisdiction Cit of Yelm a e e o e l i Ti P i d M P k H nal sis Year 2007 Without sde traffic na s s me er o ea our pro ect ID Willow Glenn III EastlWest Street: Canal Rd North/South Street: Grove Rd Intersection Orientation: North-South Stud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Streat Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R oume 141 15 6 0 7 7 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 156 16 6 0 7 7 Percent Heav Vehicles 0 - 0 -- - Median Type Untlivided RT Channelized 0 0 Lanes 1 1 0 0 1 0 onfigurafion L TR LTR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 1 15 0 7 16 110 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 16 0 7 17 122 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 1 onfigurafion LTR LT R Dela ,Queue Len th , and Level of Service pproach NB SB Westbound Eastbountl Movement 1 4 7 8 g 10 11 12 Lane Confguration L LTR LTR LT R (vph) 156 0 17 24 122 (m)(vph) 1617 1607 520 533 1077 /c 0.10 0.00 0.03 0.05 0.11 5% queue length 0.32 0.00 0.10 0.14 0.38 ontrol Delay 75 7.2 12.2 12.1 8 8 LOS A A B B A pproach Delay - -- 12.2 9 3 pproach LOS -- -- B q CopynyM ~ 2000IIniserslty of Fbeide,All Ruts Reserved Veesion 0.I file://C:\Documents%20and%20Settings\fred2\Local%20Settings\Temp\u2k49.tmp 9/30/2005 Two-Way Stop Control Page I oft I TWO-WAY STOP CONTROL SUMMARY (:nnnral Infnrma}inn Sife Information Rd 8 C G Fl l nal st (s rove- ume ana Intersection d enc /Co. Skillin s-Connoll ,Inc. urisdiction Cit o(Yelm Date Performed 9/30/2005 nal sis Year 2007 With site traffic nal sis Time Period M Peak Hour pro ect ID lMllow Glenn Ill I' file://C:\Documents%20and%20Settings\fred2\Local%20Settings\Temp\u2k49.tmp 9/30/2005 eovn~sm o zow umrersay or rmdaa. nn a~an~s aese,.~a ve~m~ a_i