Loading...
Approval letterNovember 1, 2002 Mr. Erling Birkland Yelm School District P.O. Box 476 Yelm, WA 98597 Re: SPR-01-8326-YL Ft. Stevens Elementary School, Portable Classrooms - Notice of Final Decision Dear Mr. Birkland: The Site Plan Review Committee has considered your application for the above referenced project and finds that as conditioned below, the proposed project is consistent with the Yelm Comprehensive Plan and all applicable City policy’s and development standards. Pursuant to Chapter 15.49, Integrated Project Review Process, a project which is subject to Site Plan Approval is a Type II Permit and can be appealed to the City of Yelm Hearing Examiner. An appeal must be filed within 14 days of the date of this notice. Site Plan Approval is valid for 18 months from the date of this letter. The affected property owners may request a change in property tax valuation from the Thurston County Tax Assessor’s Office. The project is approved subject to the following conditions of approval: Transportation Finding: Yelm is a small compact community most directly affected by two state highways, which bisect the community. The two state highways are used by local residents for transportation throughout the City and for access to commercial and residential areas throughout the community. In lieu of widening existing streets, the City has elected to create certain alternatives, Y-1, Y-2, and Y-3, which will avoid the need to significantly widen existing streets, and particularly Yelm Avenue. New developments do in fact burden the City’s central streets, and unless the bypass alternatives are accomplished, the City would have to require developers to pay the cost of the internal street widening. City plans show, and the City finds, that adequate facilities will be accomplished better and in a timely fashion by bypass facilities as a substitute for the widening of existing facilities. As a result, the City finds that the regional plans in fact benefit projects in all areas of the City, and will accomplish the goal of providing adequate facilities to City standards within a reasonable time to serve the demands created by the proposed project. Finding: The City of Yelm 2001 Comprehensive Transportation Plan Update lists Goals and Policies relating to transportation impacts. #30, Funding Sources Policy provides methods for financing transportation projects, and includes a policy that “requires impact mitigation payments, or seek voluntary contributions from developers”. Finding: The City of Yelm Concurrency Management ordinance also describes mitigation measures for impacts to the City’s transportation system by requiring the project to make a contribution to the facilities identified in off-site comprehensive transportation plan, in the form of a transportation facility charge. The ordinance lists the number of new pm peak trips generated by an Elementary/Jr. High School to be 0.02 trips per student. The Transportation Facility Charge is currently $750.00 per new pm peak trip. Conditions of Approval: 1. The applicant shall mitigate transportation impacts based on the new p.m. peak hour trips generated by the project. The project is classified as Institutional – Elementary/Jr. High School. The Transportation Facility Charge (TFC) shall be based on 0.02 new peak hour trips per new student, with an average of 60 students in each portable. The applicant will be responsible for a TFC of $900.00 per portable, which is payable at time of building permit. New Trip Generation Rate x per student x $750.00 = TFC 0.02 x 60 = 1.2 x $750.00 = $900.00 Per Portable Classroom Parking: Finding: Yelm Municipal Code Chapter 17.72 requires one parking stall for each ten students enrolled. Conclusion: The City finds that existing parking meets the minimum requirements of Chapter 17.72. Water Finding: The site is currently connected to the City’s Water system. Conclusion: The additional buildings will not be connected to the City water system. No further connections are required. Sewer Finding: The site is not connected to the City=s sewer system. The City has not approved additional sewer capacity or usage. Conclusion: The additional buildings will not be connected to the City sewer system. No additional connections are required. Stormwater: Findings: The proposed structures do not create more than 5,000 sq. ft. of impervious surface. Stormwater runoff from these structures will be captured and distributed by gutter drywells. Conclusion: No additional stormwater facilities will be required. Fire Findings: Fire protection is provided by Thurston County Fire District #2. As development occurs there will be additional demands for fire service. The applicant is required to provide adequate hydrant placement, and/or fire truck access. Conditions of Approval: The applicant shall submit a fire hydrant and fire truck access plan to the Community Development Department for review and approval at building permit review. Landscaping and Setbacks Finding: Landscaping and screening are necessary to promote safety, to provide screening between compatible land uses, to safeguard privacy and to protect the aesthetic assets of the City. Chapter 17.80, Landscaping, requires the applicant to provide on-site landscaping for all development proposals. Finding: Chapter 17.80, Landscaping states that whenever a non-residential activity is proposed adjacent to a residential zone or use, a minimum fifteen-foot buffer area of Type I landscaping shall be provided along the property boundary between the uses. Finding: Chapter 17.48, Open Space/Institutional District states that “If adjacent properties are in any residential district, the side yard minimum setback shall be twenty-five feet, and rear yard setback shall be a minimum of twenty-five feet. Finding: The applicant has provided a conceptual landscape plan that is acceptable to the City. Conditions of Approval: 1. The setback of the portable classrooms shall be twenty-five feet. 2. The landscape buffer between the portable classrooms and the residentially zoned properties to the South, shall be 25 feet, and landscaped with a Type I buffer. Other Conditions of Approval: Applicant shall assure that all access to, in, and around the structures is ADA compliant. A building permit from City of Yelm Community Development Department is required. Applicant must provide a lighting plan showing adequate lighting, and any proposed additional lighting for the site. If you have any questions or if I can be of further assistance please contact me at (360) 458-8496. Sincerely, Tami Merriman Planning Technician cc: Grant Beck, Community Development Director Jim Gibson, Development Services Engineer Gary Carlson, Building Official Shelly Badger, City Administrator Tim Peterson, Public Works Director