Loading...
8300 Review No.2 052202May 22, 2002 Ronald G. Vigil – Architect PO Box 15265 Seattle, Washington 98115 RE: Civil Engineering Review No. 2 Prairie Run Apartments City of Yelm Project No. SUB-01-8300-YL Dear Mr. Vigil: I have reviewed the plans submitted May 14, 2002 and dated 5/8/02. (Date of PE stamp). The following are comments from the above referenced plans and need to be addressed on the future submittal. I have organized these comments by general category. If you have any questions I have also included a set of redlined plans to clarify these comments. Sewer Plans: The proposed sewer forcemain to be located in Mountain View Rd needs to be shown in plan and profile. The scale should be 1’=30’ or larger. (IE 1”=20’) Is there enough right-of-way to build the sewer main as it has been shown? I do not believe there is. This installation may need to be moved to another location. Water Plans: No Comments at this time. Temporary Erosion and Grading Plans: No Comments at this time. Stormwater Report: See redlined stormwater report. Roadway and Stormwater Plans: The roadway frontage improvements need to begin at the centerline of the right of way. At this point, sawcut the roadway and rebuild the projects side of the roadway. Show the centerline of the right of way and existing right of way lines on the plans. The widened roadway improvements need to be tapered back to the driving lanes. Misc. Information: Please show location for mailbox clusters. You can request the city to meet with the City of Yelm Postmaster or you may do this your self. These locations must be shown on the plans. You need to submit the streetlight plans. These need to be submitted and approved before civil plans will be signed off. Please review and revise your engineering drawings. When you resubmit your package, please send 4 revised sets and two drainage reports. If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you. Respectfully City of Yelm Community Development Jim Gibson Development Review Engineer Cc: Shelly Badger Cathie Carlson Tim Peterson Enc: redlined plans and stormwater report