Prairie Run - Field Reports #1ARCHITECT’S (( OWNER ( (( USDA-STATE (( ARCHITECT FIELD REPORT (( CONTRACTOR ( ( USDA-DIST AIA DOCUMENT G711 (( LENDER ( OTHER PROJECT: Prairie Run Apartments FIELD REPORT NO: One CONTRACT: General Construction ARCHITECT’S PROJECT NO: A 0501 DATE: 6/25/02 TIME: 8:30 AM WEATHER: Sunny TEMP. RANGE: 68( F EST. % OF COMPLETION: 11% CONFORMANCE WITH SCHEDULE (+,-): Yes WORK IN PROGRESS: PRESENT AT SITE: Setting forms for footings Mark Rozgay, Owner’s Representative Installing reinforcing steel Don Casassa, Casassa Construction Co. Roger Canterberry, Carpenter Forman Gary Carlson, Yelm Building Official Ronald G. Vigil, Architect OBSERVATIONS: Site and buildings have been staked by Licensed Surveyor. The Building permit has been paid for and issued by the City of Yelm. Front setback was measured by Gary Carlson, Building Official Clearing & grubbing is complete and excess earth & debris has been disposed off site. Excavation for each building is complete and geotechnical test of footing and slab areas have been tested. Geotechniocal report shows all test in excess of 95% compaction. (Test log will be faxed separately). Formwork & reinforcing has been placed for Buildings A & E. Formwork for Buildings B & C is underway. On site storm sewer pipe, water pipe, fittings, catch basins has been delivered and stored on site. Invoice for materials provided. Sand backfill material for all underground utilities has been stockpiled on site. Topsoil has been stockpiled On site. Invoice has been provided. All horizontal & vertical reinforcing steel for footings, foundation walls has been stockpiled on site. Observed all framing materials stored at Mountain Lumber Company. Photographs have been taken and invoices have been provided. Materials are: 2x6 & 2x4 treated mud sills 2x6 exterior wall studs. 2x4 interior wall studs. 2x10 floor joists. Perimeter slab Styrofoam insulation. 7/16” OSB wall & roof sheathing. 1-1/8” OSB floor sheathing. Steel strap hold downs. 11. USDA-RD construction sign has been installed on the site. ITEMS TO VERIFY: Compliance of Capital windows with project heat loss calculations. INFORMATION OR ACTION REQUIRED: Contractor request additional sets of architectural & civil plans ATTACHMENTS: Faxed invoices, geotechnical report REPORT BY: RG Vigil page 1 of 1 pages