Loading...
Rochester fire Damage 002Conclusion Both the vertical and lateral force resisting systems would require significant upgrade in order to meet current code. The roof system, upper floor framing, slid foundation would have to be virtually replaced. The exterior wall would need additional studs and upgraded to meet shear wall requirements. I have not addressed the issues that do not pertain to structure like wiring, plumbing, and insulation. Based on the current condition of the house and the required repair and upgrade it is my opinion that it would be more cost effective to demolish the house and start over. If you have any questions or I may be of further help please call (360) 520 -1262 Sincerely Harold Halmenkratt P.E. 5 President Cc Greg Mauerman, Big Rock Construction i� —ih� o