Loading...
03-8362 Sewer AB 1 102907 City of Yelm Sewer Department Oct. 29, 2007 Re: Review Yelm High School As-Built Drawings Please show the Carson box, valve etc. serving the STEP Tank for the Auto Shop. Please check on the existence of the “End of Line” clean-out shown at Sta. 0+97 Please show the correct fittings etc. at STA # 0+97 Please show the correct fittings etc at STA # 5+40.2 The force main running down the E. side of bldg 500 appears to be not shown correctly (wrong location) The Side Sewer for the tanks serving Bldg.s 500 and 300 are not shown correctly. Please show the in-line ball valve in the service line connecting the “Auto Shop Tank” to the mainline (2”)