Meeting NotesBinding Site Plan -- or -- Short Subdivision?
Condo Association; Who is applying for this BSP?
Traffic Impact Analysis missing. TIA required for projects generating more than 20 trips.
BSP Requires:
Must show All proposed and existing buildings and setback lines
All proposed and existing utility lines
All proposed and existing stormwater facilities (condo building, road drainage)
Must show proposed use on large parcel (pad site/ building footprint) maximum site use
Must show all existing wells/radius and skeptics on or within 100 feet.
Must show all existing or proposed easements (DQ)
Must show proposed number of sq. ft. in paved or covered surfaces, and total amount of sq. ft. in the entire proposed development.
Description of each proposed commercial use
Fire Hydrant coverage
Stormwater plan incomplete
Grading/topo incomplete
Street Details
Phasing plan
Landscape plan is incomplete, need more info…
Yelm Court?
Trash enclosure not in appropriate place for truck access