Loading...
Meeting NotesBinding Site Plan -- or -- Short Subdivision? Condo Association; Who is applying for this BSP? Traffic Impact Analysis missing. TIA required for projects generating more than 20 trips. BSP Requires: Must show All proposed and existing buildings and setback lines All proposed and existing utility lines All proposed and existing stormwater facilities (condo building, road drainage) Must show proposed use on large parcel (pad site/ building footprint) maximum site use Must show all existing wells/radius and skeptics on or within 100 feet. Must show all existing or proposed easements (DQ) Must show proposed number of sq. ft. in paved or covered surfaces, and total amount of sq. ft. in the entire proposed development. Description of each proposed commercial use Fire Hydrant coverage Stormwater plan incomplete Grading/topo incomplete Street Details Phasing plan Landscape plan is incomplete, need more info… Yelm Court? Trash enclosure not in appropriate place for truck access