Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Rite Aid Frontage Costs-121602
ITEM NO. 1 2 5 6 15 24 27 28 29 31 34 36 37 40 42 43 47 52 53 56 57 65 66 67 68 71 72 73 74 75 76 87 90 92 DESCRIPTION Mobilization Clearing and Grubbing Removing Cement Conc. Curb Removing Asphalt Conc. Pavement Storage Drain Crushed Surfacing Base Coarse Crack Sealing Planing Bituminous Pavement Asphalt Concrete for Preleveling Asphalt Concrete for Paving Cl. A Irrigation System Esc Lead TESC Plan Seeding Fertilizing and Mulching Temporary Water Pollution/Esc Topsoil Red Cascade Mtn Ash Street Tree Plant Establishment-2nd Year Plant Establishment-3rd Year Cement Conc. Barrier Curb and Gutter Paint Line Temporary Pavement Markings Permanent Signing Traffic Signal Display and Detection System Induction Loop Type 1 Portable Changeable Message Sign Operation of Portable Message Sign Temporary Traffic Control Devices Piloted Traffic Control Traffic Control Labor Traffic Control Supervisor Cement Conc. Sidewalk Adjust Valve Box Roadside Cleanup Design Engineering Construction Engineering Contigency UNIT LS HA LS LS M T EST M2 T T LS DAY LS HA EST M3 EA EST EST M M M LS LS EA EA HR LS LS LS LS M2 EA EST LS LS LS UNIT PRICE 38000 5850 10000 20000 63.5 15 15000 3.75 60 46 3500 150 1500 6000 5000 24.7 290 3000 3000 35 0.6 0.15 6000 84000 1200 3000 3 15000 4400 47985 27600 27.8 100 15000 72705.5 72705.5 72705.5 % OF PROJECT 0.05 0.12 0.05 0.15 N/A N/A 0.04 N/A N/A N/A 0.12 N/A 0.05 0.05 0.05 N/A N/A 0.05 0.05 N/A N/A N/A 0.05 0.25 N/A N/A N/A 0.15 0.05 0.05 0.05 N/A N/A 0.05 0.1 0.16 Subtotal 0.1 TOTAL AMOUNT N/A N/A N/A N/A 60 80 245 44 52 N/A 2 N/A N/A N/A 75 3 N/A N/A 170 160 80 N/A N/A 3 1 200 N/A N/A N/A N/A 310 5 N/A TOTAL 1900 702 500 3000 3810 1200 600 918.75 2640 2392 420 300 75 300 250 1852.5 870 150 150 5950 96 12 300 21000 3600 3000 600 2250 220 2399.25 1380 8618 500 750 72705.5 7270.55 11632.88 91608.93 7270.55 98879.48 80m