Loading...
jul3108.fld.email Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Twin Star Credit Union April 11, 2008 PROJECT:REPORT NO: Yelm Branch Addition 04 CONTRACTOR: PROJECT NUMBER: Schwiesow Construction 0803.6 PERMIT NUMBER:INSPECTOR: BLD 070419 YL Dennis Smith I arrived at Al’s Welding to perform special inspection and testing services scheduled for visual welding inspection. Testing performed as follows: I inspected the fillet welds for the following structural members: BEAMS MARKED: 2 each – 3A; 2 each – 4A. COLUMNS MARKED: 2 each -2B columns; 2 each -2A columns; 4 each -1A columns. The welds are visually acceptable as per AWSD1.1-06. The welds are placed in accordance with the approved shop drawings. Welding performed by a WABO certified welder using Triple 7 E7018 electrode, FCAW process. NORTHWEST TESTING COMPANY, INC. Dennis Smith Dennis Smith WABO Certified Welding Inspector ACI/ICC Certified Concrete Technician cc: Jeff Kennedy, Mike Schwiesow, Fred Lawson II, Gary Carlson, Brian Unsderfer PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Twin Star Credit Union April 11, 2008 PROJECT:REPORT NO: Yelm Branch Addition 04 CONTRACTOR: PROJECT NUMBER: Schwiesow Construction 0803.6 PERMIT NUMBER:INSPECTOR: BLD 070419 YL Dennis Smith I arrived at Al’s Welding to perform special inspection and testing services scheduled for visual welding inspection. Testing performed as follows: I inspected the fillet welds for the following structural members: BEAMS MARKED: 2 each – 3A; 2 each – 4A. COLUMNS MARKED: 2 each -2B columns; 2 each -2A columns; 4 each -1A columns. The welds are visually acceptable as per AWSD1.1-06. The welds are placed in accordance with the approved shop drawings. Welding performed by a WABO certified welder using Triple 7 E7018 electrode, FCAW process. NORTHWEST TESTING COMPANY, INC. Dennis Smith Dennis Smith WABO Certified Welding Inspector ACI/ICC Certified Concrete Technician cc: Jeff Kennedy, Mike Schwiesow, Fred Lawson II, Gary Carlson, Brian Unsderfer PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT REPORT OF CONCRETE TEST SPECIMENS Date Molded:Job No: August 05, 2008 0803.6 Client: Permit No: Twin Star Credit Union BLD 070419 YL Project: Yelm Branch Addition Address: 1105 Yelm Avenue, Yelm, Washington Contractor: Sub-Contractor: Schwiesow Construction NA Concrete Supplier:Cast By: Glacier Sand and Gravel Mark Robinson o o Weather:Temp. Concrete:Temp. Air: sunny 72 68 Location of Concrete Placement: New addition exterior footings. Sampled on the first of two loads, east side. Strength Requirement:Slump: 3000 PSI @ 28 days 4.0” Cement Type: Sacks:Entrained Air: Portland I/II 5.5 NA Mix: 470# cement, 85# fly ash, 1940# ¾”, 1270# fine, 16 oz WRA Set Specimen Test @ Register Date Date Total Unit No. Size Days Number Rec'd Tested Load Load 04 4 x 8 7 1728 08-06 08-12 46000 3660 “ “ 28 1729 ” 09-02 63500 5060 “ ” 28 1730 “ 09-02 61000 4860 ” “ hold 1731 “ discard Remarks: See Field Report for further details on placement. All tests comply with specifications. P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Twin Star Credit Union August 19, 2008 PROJECT:REPORT NO: Yelm Branch Addition 12 CONTRACTOR: PROJECT NUMBER: Schwiesow Construction 0803.6 PERMIT NUMBER:INSPECTOR: BLD 070419 YL Mark Robinson Inspector Mark Robinson arrives on site, 8:20 am, for inspection of epoxy dowel placement, Overcast, 57 degrees Contractor installs #5 reinforcing dowels into the existing floor slab to connect to the addition floor slab. Bars are placed to comply with detail 7/S4.1 and to match slab reinforcing notes. Also placed are three dowel bars per thickened footings (six total bars). Materials: #5 x 14” dowel bars; Hilti-150 epoxy, expiration date 12/2008. Procedure: The holes for the dowels have been drilled with a minimum embed depth of 8”. All holes are then prepared with each drilled location blown out, brushed and re-blown with 100-psi pressurized air through a tube extending to the back of the drilled hole until no further dust or debris leaves hole. Dowels are placed with a bleed-out of epoxy upon completion to ensure full encasement of dowel. Inspector also notes that the slab preparation complies with slab notes, with #4 bar placed at 16” on center each way midway into slab, vapor barrier and perimerter insulation in place. Slab placement tentatively scheduled for Thursday. NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Licensed Professional Geologist Registered Site Assessor ACI/ICC Certified Concrete Technician cc: Jeff Kennedy, Eric Stark, Fred Lawson II, Gary Carlson, Kit Chan PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT REPORT OF CONCRETE TEST SPECIMENS Date Molded:Job No: April 11, 2008 0803.6 Client: Permit No: Twin Star Credit Union BLD 070419 YL Project: Yelm Branch Addition Address: 1105 Yelm Avenue, Yelm, Washington Contractor: Sub-Contractor: Schwiesow Construction NA Concrete Supplier:Cast By: Glacier Sand and Gravel Mark Robinson o o Weather:Temp. Concrete:Temp. Air: clear 52 33 Location of Concrete Placement: Canopy footings (4 total). Strength Requirement:Slump: 3000 PSI @ 28 days 4.0” Cement Type: Sacks:Entrained Air: Portland I/II 5.5 NA Mix: 470# cement, 85# fly ash, 1740# ¾”, 1270# fine, 16 oz WRA Set Specimen Test @ Register Date Date Total Unit No. Size Days Number Rec'd Tested Load Load 01 4 x 8 7 1551 04-14 04-18 51000 4060 “ “ 28 1552 ” 05-09 64000 5100 “ ” 28 1553 “ 05-09 65000 5180 ” “ hold 1554 “ discard Remarks: See Field Report for further details on placement. All tests comply with specifications. P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Twin Star Credit Union August 05, 2008 PROJECT:REPORT NO: Yelm Branch Addition 09 CONTRACTOR: PROJECT NUMBER: Schwiesow Construction 0803.6 PERMIT NUMBER:INSPECTOR: BLD 070419 YL Mark Robinson Inspector Mark Robinson arrives on site, 7:50 am, for inspection of forms, reinforcing, and concrete placement. Sunny, 67 degrees Contractor places concrete for the addition exterior footings. Inspector reviews plan notes on sheet S2.1 and typical wall and column footing details on S4.1. All areas are approved for placement. Concrete is placed by pump at 4.5” maximum slump at discharge and is vibrated for consolidation. One set of compressive strength test specimens is made on the placement of 16 yards and stored in the field away from the work area for later pickup. Field Note: As noted in field report #8, July 31, the contractor has drilled and epoxied three #5 dowel bars (alongside the #4 dowel bars) into the existing footing (each side) to attach to reinforcing in the new addition footings. NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Licensed Professional Geologist Registered Site Assessor ACI/ICC Certified Concrete Technician cc: Jeff Kennedy, Eric Stark, Fred Lawson II, Gary Carlson, Brian Unsderfer PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Twin Star Credit Union April 11, 2008 PROJECT:REPORT NO: Yelm Branch Addition 03 CONTRACTOR: PROJECT NUMBER: Schwiesow Construction 0803.6 PERMIT NUMBER:INSPECTOR: BLD 070419 YL Mark Robinson Inspector Mark Robinson arrives on site, 5:45 am, for inspection of reinforced concrete placement . Clear, 33 degrees. Contractor places concrete for the canopy footings (4-total). Inspector reviews structural notes for concrete mix on sheet S1.0, footing plan notes on sheet S2.1, and canopy footing detail 9/S4.1. All areas approved for concrete. Concrete is placed by truck chute at 4.0” maximum slump at discharge and is vibrated for consolidation. One set of compressive strength test specimens is made on the placement of 6.5 yards and stored in the field cure box away from the work area for later pickup. NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Licensed Professional Geologist Registered Site Assessor ACI/ICC Certified Concrete Technician cc: Jeff Kennedy, Mark Schwiesow, Fred Lawson II, Gary Carlson, Brian Unsderfer PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647